Laserfiche WebLink
Median Landscape at Iodine and Nowthen Boulevard <br /> <br />The Planning Commission will have made a recommendation to remove Or allow the <br />median from the plan. If allowed, it is presumed that the median/entrance to this <br />subdivision will be landscaped and irrigated. Detail would then need to be approved. <br /> <br />Trail and Sidewalk Routing <br /> <br />Sidewalks are required and should be shown on the north side of Iodine, 143rd Avenue, <br />144th Lane and the east side of Fluorine and 144th Circle among the townhouse. <br /> <br />The trails within the proposed park areas (installed as a Stage 1 improvement) are eligible <br />for construction credit against the Trail Fees due. Consistent with past practice, credit is <br />not available for transportational trails along County, State and City MSA roadways. <br />This would be west of the water tower along County Road 5. Credit will be given for <br />trail constructed on the tower site:' <br /> <br />Staff recommends a detailed motion to incorporate all of the Park and Recreation <br />Commission issues. <br /> <br />Commission Action: <br /> <br />Based on discussion <br /> <br />Reviewed by: <br /> <br />Parks/Utilities Supervisor <br />City Engineer: SJJ <br />Principal Planner <br /> <br />Copies to: <br /> <br />Mike Black, Royal Oaks Realty <br />City Administrator <br />Public Works Director <br />City Engineer: BEO <br /> <br />P & R: 01/10/02 <br /> <br />.3- <br /> <br /> <br />