My WebLink
|
Help
|
About
|
Sign Out
Home
02/14/95
Ramsey
>
Public
>
Dissolved Boards/Commissions/Committees
>
Road and Bridge Committee
>
Agendas
>
1995
>
02/14/95
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/29/2025 11:01:47 AM
Creation date
7/9/2003 11:30:01 AM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Document Title
Road and Bridge Committee
Document Date
02/14/1995
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
in use, particularly among the smallest agencies, but other methods are generally preferred. <br /> <br />d) l,illl~._~: This basis (also called a "fLxed fee" by some) can provide the greatest <br /> "comfort" for the agency, but it requires the greatest effort to negotiate and describe the <br /> contract scope of work. Other fee bases can be used as a general guide for establishing the <br /> lump sum, as can some of the published fee cost information which is available. The lump <br /> sum method clearly mandates fee re-negotiation if major additional work is requested or <br /> approved, or a significant part of the work is deleted. <br /> <br />Action: <br /> <br />Based upon discussion. <br /> <br />Reviewed by: <br /> <br />City Engineer <br />City Administrator <br />Finance Officer <br /> <br />R&B: 2/14/95 <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.