My WebLink
|
Help
|
About
|
Sign Out
Home
Minutes - Planning Commission - 01/03/1995
Ramsey
>
Public
>
Minutes
>
Planning Commission
>
1995
>
Minutes - Planning Commission - 01/03/1995
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/20/2025 2:50:16 PM
Creation date
7/9/2003 11:34:44 AM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Minutes
Meeting Type
Planning Commission
Document Date
01/03/1995
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
15
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
o <br /> <br />EDC claims surrounding communities, primarily Dayton, are undecided. Actually <br />Dayton has withdraw its support for the East location because so many citizens <br />oppose it. <br /> <br />o <br /> <br />If the West alignment is selected the surrounding land will be zoned commercial <br />not residential as suggested by EDC. The West location has significant <br />commercial development potential, which is not possible with the East alternative. <br />Commercial development will view the West bridge as a benefit not a disruption. <br /> <br />Deficiencies in Road Design - Capacity <br /> <br />EDC's road design was intentionally under specified so its cost would compare <br />favorably. The combination of A "diamond" interchange at highway 10 (when a <br />cloverleaf is needed) and a "T" intersection at 116 will not accommodate the expected <br />volume of traffic. <br /> <br />Deficiencies in Road Design - Safety <br /> <br />A safe diamond interchange could be developed, however EDC focused on minimizing <br />property acquisition instead of safety. Inadequate clearance between the Highway 10 <br />acceleration/deceleration lanes and adjoining driveways is provided. The EDC design has <br />trucks carrying tons of equipment from Kovar and liquid petroleum from two propane <br />dealers entering and exiting the acceleration and deceleration lanes. <br /> <br />Additional property is needed for a safe interchange at Highway 10. A safe intersection <br />with adequate traffic flow will require a "cloverleaf" not a diamond interchange. <br /> <br />Site Constraints Resulting in Additional Cost <br /> <br />The constraints imposed by existing businesses, critical rivers boundary and railroad <br />tracks increase the likelihood that a more costly interchange design will be required. <br /> <br />Site Constraints Resulting in Diminished Commercial Potential <br /> <br />The constraints imposed by the existing businesses, critical rivers boundary and railroad <br />tracks virtually eliminate any commercial potential at this intersection. <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.