My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Public Works Committee - 11/19/2002
Ramsey
>
Public
>
Agendas
>
Public Works Committee
>
2000 - 2009
>
2002
>
Agenda - Public Works Committee - 11/19/2002
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/13/2025 1:57:04 PM
Creation date
7/16/2003 2:01:57 PM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Public Works Committee
Document Date
11/19/2002
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
36
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
P.W. CASE: <br /> <br />UPDATE TO THE 155TM LANE NW STORM SEWER PROJECT <br /> By: Brian E. Olson, Principal City Engineer <br /> <br />Background: <br /> <br />As part of the construction of the 4 developments located on the northwest quadrant of <br />Trunk Highway 47 and Alpine Drive, dewatering was necessary to install some deep <br />utilities2 The Contractor for Wildlife Sanctuary, S.J. Louis, Inc., applied and received a <br />DNR appropriations permit for those dewatering activities. Since the dewatering began, <br />we have ran into some issues with the water that is being pumped into the wetland east of <br />Highway 47. <br /> <br />There has been numerous discussions with the residents that live around the DNR wetland <br />located ~east of Hwy 47 and north of Alpine Drive NW. The residents are generally concerned <br />with the level that the water reaches before entering into the culvert that was installed on the <br />west side of 155th Lane NW. Attached is a map showing how the water flows before reaching <br />the Rum River. <br /> <br />The purpose of the case is to discuss the project and discuss the .possibility of purchasing the <br />easemer~ts necessary to achieve the level necessary during a 100-year rainfall event. Hakanson <br />Anderson Associates provided a model of the storm sewer and updated the Southeastern <br />Stormwater Plan as part of the design work for those developments. The 100 year design <br />elevation is expected to reach an elevation of 864. This. elevation is depicted in the attached <br />resolution and will be explained at the meeting on Tuesday night. <br /> <br />There is iapproximately S.F. (to be estimatedby Tuesday night) of land located inside <br />and outside of the wetland limits. At $0.10 per square foot of land this could amount to <br />$ <br /> <br />Committee Action: <br /> <br />Motion to recommend to the City Council to hire Hakanson Anderson for a not to exceed <br />amount of $1,000 to survey the 864 contour and provide legal descriptions of easements <br />necessary to achieve the 100 year rainfall event. <br /> <br />Reviewed by: <br /> <br />Public Worka Director/Fire Chief <br />City Administrator <br /> <br />PW: 11/19/02 <br /> <br />P. 23 <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.