My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council - 07/22/2003
Ramsey
>
Public
>
Agendas
>
Council
>
2003
>
Agenda - Council - 07/22/2003
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/24/2025 3:51:53 PM
Creation date
7/18/2003 3:48:56 PM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council
Document Date
07/22/2003
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
581
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
iV. <br /> <br />dd. <br /> <br />Provisions to carry runoff to the nearest <br />adequate outlet; <br /> <br />Location of any proposed Ponding areas, <br />indicating the size and depth of the pond and <br />amount of acre feet of water to be stored; <br /> <br />f. Finish floor elevations of all buildings; <br /> <br />gg. <br /> <br />Identify ~0ils by type and location, including <br />identification of the water table, and <br />suitability of soil for the proposed <br />development; and <br /> <br />Identify any areas located in a flood hazard <br />zone as identified by the Department of <br />Natural Resources. <br /> <br />Floor Plans and Elevations. All floor plans and <br />elevations shall be drawn to a Iegible scale and shall <br />include the following information: <br /> <br />Floor plans indicating square footage and <br />dimensions of all proposed rooms; and <br /> <br />bb. <br /> <br />Elevations of the proposed building(s), <br />identifying exterior treatment, material(s), <br />and paJm color. <br /> <br />.i. <br /> <br />Final Plat. If a Subdivision is required, the £mal <br />plat shall be prepared in accordance with the <br />Ramsey City Code. With the final plans, the <br />developer shall submit, for approval by the City, a <br />development schedule for construction of all <br />structures, open space, and recreational facilities. <br /> <br />Final Plat and Site Plan Review Process <br /> <br />Upon approval of the Preliminary Plat and Site <br />Plan, a Final Plat and Site Plan shall be prepared in <br />accordance with the regulations of this ChaPter and <br />submit it to the Zoning Administrator 30 days pr/er <br />to the public hearing. <br /> <br />Ramsey Town Center Disn'ict <br />July 2003 Planning Commission approved <br /> <br />page 19 <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.