Laserfiche WebLink
(3) years after final plat approval. The CITY will bill residents in the Plat at least quarterly <br />for street light maintenance and operation costs; billing will be initiated at the time a <br />residence connects to municipal water and sanitary sewer. The DEVELOPER will pay to <br />the CITY an amount equal to 100% of the City Engineer's estimated construction cost of' the <br />items prior to recording of the final Plat. The City Engineer's estimated cost of construction <br />is: <br /> <br />a) Street striping and signing (4~$200) <br />b) Traffic signing (4~$200) <br />c) Future Through Street Signing (5~$200) <br />d) Street lights (12~$1500) <br />e) Street light maintenance (12~$270) <br />f) Street sweeping <br />g) Seal coating (14,000 sq. yds ~$.85/sq. yd.) <br /> <br />$800.00 <br />$800.00 <br />$1,000.00 <br />$18,000.00 <br />$3240.00 <br />$300.00 <br />$16,470.00 <br /> <br />("Stage II Improvements") <br /> <br />Total $40,610.00 <br /> <br />13. <br /> <br />Hard Surfaced Driveways. Hard surfaced driveways (bituminous or concrete) are a <br />requirement for each lot in the Plat. Said improvement shall be installed by the building <br />permit applicant, or the homeowner at the time the Certificate of Occupancy is issued or as <br />soon thereafter as possible, weather permitting. In the event this improvement is not timely <br />installed on a lot, the DEVELOPER and/or the DEVELOPER'S assign(s), agrees that the <br />CITY may install said improvement on the lot and specially assess the cost therefore against <br />the lot. The DEVELOPER hereby waives ail right to a public hearing and other statutory <br />rights or City Charter rights granted a property owner relating to special assessments, <br />including the right to appeal the special assessment for installation of the hard surfaced <br />driveway. In addition, the DEVELOPER grants the CITY a license to enter on each lot of <br />the Plat in order to install the improvement described in this paragraph if the same has not <br />been previously constructed. <br /> <br />14. <br /> <br />Street Cleaning. After the street surfacing is installed, the DEVELOPER shall clear any <br />soil, earth, or debris from the streets within the Plat resulting from any construction within <br />the Plat by the DEVELOPER or its successors and assigns. From time to time, the CITY <br />may remove accumulations of soil, earth and debris from the streets resulting from the <br />construction of the Plat. It shall be the DEVELOPER'S responsibility to pay the costs <br />associated with this necessary street cleaning. Invoices from the CITY to the DEVELOPER <br />for such costs shall be paid within fifteen (15) days of the datd of invoice. <br /> <br />15. <br /> <br />Private Streets and On-Street Parking. On-street parking shall be prohibited on private <br />streets. All parking restrictions shall be signed and said signing shall be subject to the <br />approval of the CITY. At no time will the private streets be maintained or accepted for <br />ownership by the CITY. These items shall be clearly stated in the covenants drafted as part <br /> <br />-488- <br /> <br />Alpine Acres Subdivision <br />Development Agreement <br />Page 6 of 13 <br /> <br /> <br />