Laserfiche WebLink
'Connective' Park Drive Segments <br /> <br /> Option A <br />2,060 lineal feet of 'rural' section road at $60 per foot <br />This 2, 060feet of park drive represents the connective pieces <br />adjacent to parking areas that does not have putl-off parking <br />attached to them. The park drive would be a 24-foot bituminous surface: <br /> <br />$123,600 <br /> <br /> Option B <br />2,060. lineal feet of 'urban' section road at $80 Per foot <br />This is the same 2, 060feet of 'connective 'park drive as in Option A. <br />The estimated $165 thousand construction expense is for a 32 'foot <br />back-to-back curb drive. Because storm retention design needs may be <br />greater, the actual cost of an urban section may be greater. <br /> <br />$164,800 <br /> <br />Deciduous trees <br /> <br /> Option AA <br />543 deciduOus bare root trees at $90 each installed <br />This cost is predicated on city staff working 3vith volunteers for <br />planting <br /> Option BB <br />543 deciduous b & b trees at $400 each installed <br /> <br />$48,s7o <br /> <br />$217,200 <br /> <br />121 coniferous b & b trees at $400 each installed <br /> <br />$48,400 <br /> <br /> <br />