My WebLink
|
Help
|
About
|
Sign Out
Home
Minutes - Council - 02/23/1993
Ramsey
>
Public
>
Minutes
>
Council
>
1993
>
Minutes - Council - 02/23/1993
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/4/2025 4:06:14 PM
Creation date
7/21/2003 10:33:41 AM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Minutes
Meeting Type
Council
Document Date
02/23/1993
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
15
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br /> <br />I Case ~: Presentation by Dave Baack, President of Ramsey Youth <br /> Athletic Association (RYAA) <br /> <br />1 <br /> <br />Dave Baaok had called earlier to report he would not be able to make it to the Council <br />meeting. <br /> <br />I <br />! <br />I <br />I <br />I <br /> <br />PUBLIC HEARING <br /> <br />Case #3: 1993 Annual Street Maintenance Program <br /> <br />City Engineer Jankowski stated this public hearing scheduled is for a series of street <br />projects, r The purpose of a street maintenance program is to protect the people's investment <br />in their sixeets. There arc nine projects total; seven include crack filling and sealcoating and <br />two include overlays. Overlays cost about four times more than sealcoating. The projects <br />will be set up in contract form and bid by local contractors. They will be assessed on a per <br />unit basis. <br /> <br />Mayor Gilbertson adjourned the regular meeting at 8:08 p.m. in order to conduct the <br />followin$ public hearing: <br /> <br />1) 1993 Annual Street Maintenance Program <br /> <br /> Mayor Gilbertson called the regular meeting back to order at 8:30 p.m. <br />I Case #4: Grading and Paving Improvement of Bison <br /> Improvement Projects 092-20 and 092-23 <br /> <br />Street N.W., <br /> <br />City Engineer Jankowski stated that at the last City Council meeting, public hearings were <br />held for Improvement Project g92-20 and 092-23 which are the grading and paving plans <br />of Bisor~ Street N.W. The public hearing for the northern part of Bison Street (Project <br />092-20) Was officially closed. Mr. Jankowski stated he was directed to modify the study <br />so the improvement for thc southern part (Improvement Project g02-23) would include a <br />eul-de-sao terminating approximately 350 feet north of thc Section 9 Half Section Line. <br />The cul-de-sac will be paved with a 32 foot radius which would alleviate the need for <br />acquiring additional right-of-way beyond the existing four rods. It is also proposed that <br />171st Avenue N.W. between Bison Street N.W. and Zeolite Street N.W. be removed to <br />reduce traffic in Golden Eagle Estates. The existing pavement west of the west line of <br />Golden F..agle Estates would be removed and bollards placed across the width of the right- <br />of-way t0~prevent vehicle access. The bollards and an eight foot bituminous path would <br />still allow pcdcsfrian access. <br /> <br />Mayor Gilbertson adjourned the regular meeting at 8:34 p.m. in order to conduct the <br />followingpublic hearing: <br /> <br />1) <br /> <br />.,_~t~_ _d~_g and Paving Improvement of Bison Street N.W., Improvements Projects <br />#92-20 and g92-23 <br /> <br />Mayor Ollbertson called the regular meeting back to order at 8:50 p.m. <br /> <br />Case #$: Request for a Conditional Use Permit Amendment; Case of <br /> Danny*s Aluminum Processing, Inc. <br /> <br />Zoning Administrator Frolik stated that in January, she reported to City Council that Dan <br />Karst, Danny's Aluminum Processing, Inc., was in compliance with his conditional use <br /> <br />City Council/February 23, 1993 <br /> Page 4 of 11 <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.