My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council - 12/11/2007
Ramsey
>
Public
>
Agendas
>
Council
>
2007
>
Agenda - Council - 12/11/2007
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/19/2025 1:57:00 PM
Creation date
12/7/2007 12:44:31 PM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council
Document Date
12/11/2007
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
488
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
INTRODUCTION <br />The City received a petition for street grading and pavement improvements on December <br />10, 2004. The petition received requested that the following segments of street; 163'~d <br />Lane from Variolite Street to Uranimite Street; Uranimite Street from 163~a Lane to 164`h <br />Lane; 164`x' Lane from Uranimite Street to Sapphire Street; Sapphire Street from 164`'' <br />Lane to 164"' Avenue; and 164`'' Avenue from Sapphire Street to a point 300 feet east <br />thereof, hereafter which shall be referred to as Welcome's Road, be considered for <br />improvements consisting of grading and bituminous paving. The project area is illustrated <br />in Figure L A copy of this petition is included in Appendix A. <br />This petition was considered by the City Public Worlcs Committee on January 18, 2004 <br />and was forwarded to the City council with a recommendation that a feasibility study be, <br />prepared. This recommendation was ratified by the City Council at the February 8, 2005 <br />meeting. A public hearing was held on April 12, 2005. The project was ordered on June <br />14, 2005 and plans and specifications were prepared. The project was bid on February 23, <br />2006 and all bids were rejected as required by the City Council on February 28, 2006 <br />since the bids exceeded the original feasibility study estimate by more than 10%. On <br />February 28, 2006 the City Council also directed that a Public Hearing be held on April <br />28, 2006 to initiate the process for reconsideration of this project in light of the higher <br />costs. At the public hearing testimony presented requested that the City consider <br />additional financial participation in the project. Subsequent to a meeting with project <br />residents on Thursday April 27, 2006 the Public Worlcs Committee recommended to City <br />Council that items associated with. storm sewer be fiulded through the Stonn Water <br />Utility. On May 23, 2006 the City. Council ratified the recommendation of the Public <br />Works Conunittee and also extended the date for petitioning against this project as <br />provided by City Code to June 9, 2006. <br />In addition to restating the existing and proposed conditions this revised feasibility study <br />will identify the project costs and financing in accordance with this most recent City <br />Council direction. - <br />EXISTING CONDITIONS <br />The streets above identified as Welcome's road consist of slightly over one half mile of <br />sand surfaced street which varies in width, but are generally about 30 feet wide. The <br />alignment does not consistently follow the center of the 66 foot right of way. Drainage is <br />provided by roadside ditches and driveway culverts along most of the length of the <br />project. area, but are lacking over a significant portion of the roadway. <br />-204- <br />-e- <br />
The URL can be used to link to this page
Your browser does not support the video tag.