Laserfiche WebLink
• Mayor Gamec stated this is a case ~~There they have worked with this developer and given him all <br />the alternatives. This may force things so that the other people will sell or have a better price. <br />He thinks the Council continues to give certain .excuses to some extent, although everyone is <br />entitled to their opinion. Something has to happen, and he hates to continue sending this back or <br />denying this plat when the developer has probably done all kinds of «~ork to get this through and <br />work with the City. These eight units times 16 cars will not change the traffic problem there and <br />the problems they are having on County Road 5. The developer has done the cul-de-sac and all <br />the different things the City has required. He does not know what more they can put on the <br />developer. <br />Coiulcilmember Jeffrey stated he does not disagree that this developer has done a lot. of work, <br />but the average townhomes generate about seven, trips per day; this would result in 49 trips per <br />day. It has always been a safety issue for him with Highway 5 and he has been consistent with <br />.that. <br />Councilmember Olson requested verification that there are no turn lanes planned in this location. <br />Public Works Director Olson stated the County is requiring a re-striping for a right turn lane, but <br />not a Ieft turn lane. He indicated he would like to make a suggestion. One of the concerns has <br />been how they can guarantee there will be a continuation of the road in the future.. One thing <br />maintenance staff and engineering looked at today was construct the permanent eul-de-sac on the <br />south side and stripe it so it is indicative of a temporary situation, making sure that is where the <br />• permanent cul-de-sac is located if there is any development to the north. To Ms. Frolik's point, <br />they have discussed this development a number of times and there is a timeline associated with <br />this. <br />Assistant Community Development Director Frolik indicated the recent timeline extension <br />allows until October 15, ?007. <br />Mayor Gamec asked if it is recommended that the temporary cul-de-sac would be paved. <br />Public Works Director Olson replied the curbing would be permanent and everything else would <br />be paved with bituminous: <br />Mayor Gamec stated it should be ensured that any future developer knows that the street will be <br />constructed, and that they will have to work that •in. His feeling is that once they start with this <br />there «rill be other people. that do their next parcels. <br />Councilmember Elvig pointed out they have run into problems before v~There they thought the <br />City. had access. He questioned if they can be certain that the ground will be dedicated all the <br />way to the edge of the property. <br />Public Works Director Olson replied yes, it will be required as part of the plat. He noted that this <br />has been revised a number of times. In the process of making it to the point where they are, there <br />was a grading plan that needed to be revised, and the developer did not want to revise it because <br />• <br />City Council /August 14, 2007 <br />Page 11 of 32 <br />-349- <br />