My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council - 12/11/2007
Ramsey
>
Public
>
Agendas
>
Council
>
2007
>
Agenda - Council - 12/11/2007
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/19/2025 1:57:00 PM
Creation date
12/7/2007 12:44:31 PM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council
Document Date
12/11/2007
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
488
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• <br />Lower Rum River Watershed Managemenfi Organization <br />Andover-Anoka-Coon Rapids-Ramsey <br />.2015 First Avenue; Anoka, MN 55303 <br />To: Lower Rum River Water Management Organization <br />From: Barr Engineering Company <br />Date: August 15, 2006 <br />Re: Permit #2006-03: Wild Oaks of Ramsey: Ramsey <br />We have received plans and a LRRWMO permit for the Wild Oaks of Ramsey development to be located <br />in the southeast quadrant of the intersection of 173rd Avenue N.W. and Nutria Street N.W. iri Ramsey. The <br />site is 36.4 acres in area and 14 single-family lots are proposed. 18.4 acres of the development are <br />wetlands. <br />Two on-site storm water management basins are to be constructed on the site. These basins provide water <br />• quantity and quality control meeting the LRRWMO criteria. The low floor elevation of the proposed <br />structures riparian to the wetland and the storm water management basins are shown to be a minimum of <br />two feet above the 100-year frequency flood elevation of the wetland and/or basin, as :calculated by John <br />Oliver &Associates. <br />At the limits of construction, erosion control measures are shown to minimize the potential of sediment <br />leaving areas altered on the site. <br />It is our recommendation that the LRRWMO approve of the permit for this project subject to the following <br />conditions: <br />1. All erosion control measures must be installed at the initial stages of construction and be <br />maintained until all areas altered have been restored. <br />2. Upon completion of construction and restoration of disturbed areas, the permit applicant is <br />responsible for the removal of all erosion control measures installed throughout the construction <br />site. <br />3. To minimize the potential of material from leaving the site and being tracked onto the roadway, a <br />rock filter dike being a minimum of two feet in height and having side slopes of 4:1 must be <br />constructed at the entryway onto the site. The rock filter dike will provide an erosion control <br />• facility and also enable construction traffic to enter the site. <br />4. Street sweeping must be undertaken and completed on an as needed basis. <br />C:\Documents and Settings\sjankowski\Deskrtop\I,RRWMO\2006 Permit memos\Irr0603c:doc -4 ~ 1 - <br />
The URL can be used to link to this page
Your browser does not support the video tag.