My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council - 12/11/2007
Ramsey
>
Public
>
Agendas
>
Council
>
2007
>
Agenda - Council - 12/11/2007
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/19/2025 1:57:00 PM
Creation date
12/7/2007 12:44:31 PM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council
Document Date
12/11/2007
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
488
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• <br />Lower Rum River Watershed Management Organization <br />Andover-Anoka-Coon Rapids-Ramsey <br />2015 First Avenue; Anoka, MN 55303 <br />To: <br />.From: <br />Date: <br />Re: <br />Lower Rum River Water Management Organization <br />Barr Engineering Company <br />August 15, 2006 <br />Permit #2006-20: Amber Ridge: Ramsey <br />We have received plans and a LRRWMO permit for the Amber Ridge development to be located south of <br />149 Avenue N.W. and east of St. Francis Boulevard N.W., T.H. 47, in Ramsey. The site is 2.2 acres in <br />.area and Ssingle-family residential lots are proposed. <br />The plans show that storm water from the site is to be conveyed to a storm water management basin to be <br />constructed on the northern end of the site. The basin has been designed to meet the LRRWMO storm <br />• water management requirements. The 100-year frequency flood elevation of the basin, as calculated by LSJ <br />Engineering, is 865.4 M.S.L. The lowest floor elevation of a proposed structure, Lot 1, is 867.5 M.S.L. <br />Erosion control is shown to be installed at the limits of construction. <br />It is our recommendation that the LRRWMO approve of the permit for this project subject to the following <br />conditions: <br />1. All erosion control measures must be installed at the initial stages of construction and be <br />maintained until all areas altered have been restored. <br />2. Upon completion of construction and restoration of disturbed areas, the permit applicant is <br />responsible for the removal of all erosion control measures installed throughout the construction <br />site. <br />3. To minimize the potential of material from leaving the site and being tracked onto the roadway, a <br />rock filter dike being a minimum of two feet in height and having side slopes of 4:1 must be <br />constructed at the entryway onto the site. The rock filter dike will provide an erosion control <br />facility and also enable construction traffic to enter the site. <br />4. Street sweeping must be undertaken and completed on an as needed basis. <br />• 5. In all cases where the doing by the pennittee of anything authorized by this permit shall involve <br />the taking, using, or damaging of any property, rights or interests of any other person or persons, or <br />of any publicly owned lands or improvements or interests, the pennittee before proceeding shall <br />C:\Documents and Settings\sjankowski\Desktop\LRRWMO\2006 Permit memosUrr0620.doc -41 1 - <br />
The URL can be used to link to this page
Your browser does not support the video tag.