Laserfiche WebLink
3. To minimize the potential of material from leaving the site and being tracked onto the roadway, a <br />rock filter dike being a minimum of two feet in height and having side slopes of 4:1 must be <br />constructed at the entryway onto the site. The rock filter dike will provide an erosion control <br />facility and also enable construction traffic to enter the site. <br />4. Street sweeping must be undertaken and completed on an as needed basis. <br />5. In all cases where the doing by the permittee of anything authorized by this permit shall involve <br />the taking, using, or damaging of any property, rights or interests of any other person or persons, or <br />of any publicly owned lands or improvements or interests, the permittee before proceeding shall <br />obtain. the written consent of all persons, agencies, or authorities concerned, and shall. acquire all <br />necessary property rights and interest. <br />C:\Documents and Settings\sjankowski\Desktop\LRRWMO\2006 Permit memos\Irr0621.doc <br />-414- <br />