My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council - 12/11/2007
Ramsey
>
Public
>
Agendas
>
Council
>
2007
>
Agenda - Council - 12/11/2007
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/19/2025 1:57:00 PM
Creation date
12/7/2007 12:44:31 PM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council
Document Date
12/11/2007
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
488
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• <br />Lower Rum River Watershed Management Organization <br />Andover-Anoka-Coon .Rapids-Ramsey <br />2015 First Avenue;. Anoka, MN 55303 <br />To: Lower Rum River Water Management Organization <br />From: Barr Engineering Company. <br />Date: .October 18, 2006 <br />Re: Permit #2006-24: Northfork Office Condos: Ramsey <br />We have received plans and a LRRWMO permit for Northfork Office Condos to be located at 156"' Lane <br />N.W. and 156"' Avenue N.W. in Ramsey. The site is 11 acres in area and 11 town offices are shown to be <br />constructed. <br />A storm water management basin is located in the southwest corner of the site. This basin is land-locked <br />and we have received soils inforniation that the elevation of modeled soil conditions is approximately 3.3 <br />• -.feet below the bottom of the basin. The basin is too be increased in size and capacity to provide sufficient <br />volume to store the 10-day 100 year frequency storm event. The low floor elevation of the proposed <br />structures are shown to be set a minimum of two feet above the 100-year flood elevation of 878.4 M.S.L. <br />as calculated by John Oliver & Associates. <br />Erosion control is shown to be installed at the limits of construction. <br />It is our recommendation that the LRRWMO approve of the permit for this project subject to the following <br />conditions: <br />1. All erosion control measures must be installed at the initial stages of construction and be <br />maintained until all areas altered have been restored. <br />2. Upon completion of construction and restoration of disturbed areas, the permit applicant is <br />responsible for the removal of all erosion control measures installed throughout the construction <br />site. <br />3. To minimize the potential of material from leaving the site and being tracked onto the roadway, a <br />rock filter dike being a minimum of two feet in height and having side slopes of 4:1 must be <br />• constructed at the entryway onto the site. The rock filter dike will provide an erosion control <br />facility and also enable construction traffic to enter the site. <br />4. Street sweeping must be undertaken and completed on an as needed basis. <br />C:~Documents"and Settings~SjankDwski~Desktop\LRRwM0~2006 Permit memosUrr0624a.doc -41 7 - <br />
The URL can be used to link to this page
Your browser does not support the video tag.