Laserfiche WebLink
<br />COMPREHENSIVE PLAN GOALS <br />By: Leonard Linton, Civil Engineer II <br /> <br />CASE # ~ <br /> <br />Background: <br /> <br />The City is required to update the Comprehensive plan every 10 years. A series of meetings were <br />held in 2007 to gather community input in advance of drafting the revised plan. A summary of <br />the compiled comments from these meetings is attached. <br /> <br />Observations: <br /> <br />The City obtained a grant to hire a facilitator to assist with the first meetings in the series. The <br />topics were posted in advance of the meetings and discussions were limited to the topic of the <br />night. Each meeting had several break out groups to focus on specific subjects under the general <br />heading. Notes were taken in each session and a summary was shared with the entire group at <br />the end of the evening. Copies of the notes were collected and compiled by staff. <br /> <br />Amy Geisler, Associate Planner will be available at the meeting to talk about the process and <br />answer questions. <br /> <br />Commission Action: <br /> <br />None required - for information only. <br /> <br />Reviewed by: <br />Public Works Director <br /> <br />P & R: 1/10/08 <br />