My WebLink
|
Help
|
About
|
Sign Out
Home
2008 - 2012
Ramsey
>
Finance
>
Capital Improvement Program
>
2008 - 2012
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/18/2014 9:58:43 AM
Creation date
1/9/2008 3:24:03 PM
Metadata
Fields
Template:
Finance
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
345
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Capital Improvement Program <br />City of Ramsey, Minnesota <br />Project # <br />Project Name <br />06- PARK -013 <br />Peltzer Park Connections <br />Description <br />Extending the access trail to the play equipment - around the cul de sac easterly to right -of -way on 148th lane. <br />The second connection, further to the east, would require acquisition of part of the lot presently managed by MPCA. This would allow for street, <br />and/or trail connections from 148th to the cul de sac of Garnet Street. <br />Justification <br />Two important trail opportunities exist relative to Peltzer Park. The first is immediately available, and consists of extending the access trail to the <br />play equipment - around the cul de sac easterly to right -of -way on 148th lane. This provides residents of Regency Ponds more of a direct access to <br />the park. <br />The second connection, further to the east, would require acquisition of part of the lot presently managed by MPCA. This would allow for street, <br />and/or trail connections from 148th to the cul de sac of Garnet. Street, and thereby improve access to both Peltzer and Alpine Parks - as well as - <br />provide a circuitous walking loop within these neighborhoods. (See also Savanna Trail bridge.) <br />Modest signage and improved landscape at Peltzer would be a benefit as well. <br />Revi )ec 11 /07 <br />Expenditures <br />Funding Sources <br />Improvements Other than Build <br />2008 thru 2012 <br />Contact <br />Department Park Improvements <br />Type Improvement <br />Useful Life 20 Years <br />Category Park Improvement <br />Priority n/a <br />$45,000 <br />Total Project Cost <br />2008 • 2009 2010 2011 2012 Total <br />45,000 45,000 <br />Total 45,000 • 45,000 <br />2008 2009 2010 2011 2012 Total <br />Park Improvement Trust Fund 45,000 45,000 <br />Total 45,000 45,000 <br />
The URL can be used to link to this page
Your browser does not support the video tag.