My WebLink
|
Help
|
About
|
Sign Out
Home
2008 - 2012
Ramsey
>
Finance
>
Capital Improvement Program
>
2008 - 2012
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/18/2014 9:58:43 AM
Creation date
1/9/2008 3:24:03 PM
Metadata
Fields
Template:
Finance
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
345
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Capital Improvement Program <br />City of Ramsey, Minnesota <br />Project # 05 -STRM -001 <br />Project Name Mississippi Subdistrict No. 1 Phase II <br />Description <br />This project will complete the extension of the storm water pipe to the western portion of Special Mississippi Subwatershed No. 1 taxing district. <br />Storm sewer will be installed from the western border of the Lowell's Auto Supply lot to the Plants -N- Things property. The project will also <br />include an overflow across Sunfish Lake Blvd which will provide an outlet for the Business Park 95 regional pond. <br />Justification <br />This project satisfies two goals: <br />1) Provide adequate drainage to the Mississippi Subdistrict No. 1, which includes the area north of Highway 10 and south of the railroad between <br />Sunfish Lake Blvd and the eastern City limits. The western properties will be receiving drainage capacity for future development. <br />2) Provide an outlet for the Business Park 95 Detention Pond. <br />This project will also benefit the Sunfish Lake Blvd improvement project. <br />Expenditures 2008 2009 2010 2011 2012 Total <br />Land Acquisition 200,000 • 200,000 <br />Improvements Other than Build 250,000 250,000 <br />Revised 11/07 <br />Total 450,000 <br />2008 thru 2012 <br />Contact Unassigned <br />Department Stormwater Utility <br />• Type Improvement <br />Useful Life 50 Years <br />Category Storm Water Utility Improvem <br />Priority n/a <br />Total Project Cost S450,000 <br />450,000 <br />Funding Sources 2008 2009 2010 2011 2012 Total <br />Storm Water Levy 450,000 450,000 <br />Total 450,000 450,000 <br />
The URL can be used to link to this page
Your browser does not support the video tag.