Laserfiche WebLink
Capital Improvement Program <br />City of Ramsey, Minnesota <br />2008 thru 2012 <br />Project # 04 - WTR - 015 <br />Project Name South Highway 10 Frontage Road <br />Description <br />Contact Unassigned <br />Department Water Utility <br />Type Improvement <br />Useful Life 50 Years <br />Category Water Utility Improvement <br />Priority n/a <br />Total Project Cost S90,000 <br />This project would consist of 1,000 lineal feet of watermain and boring under Highway 10, and a watermain loop provided for residents south of <br />Highway 10. <br />Total project costs including land, street, sewer, water and storm sewer = $790,000. <br />l <br />Justification . <br />Water improvements that would be required to encourage optimal development and redevelopment within the area. Additionally, the residents east <br />of Tungsten (as well as the new development) would be on a dead end line. The looping of the watermain would benefit these individuals by <br />providing a more continuous flow of water and better fire protection. <br />RevihY1 /07 <br />Expenditures <br />Building Cost/Construction <br />2008 2009 2010 2011 2012 Total <br />90,000 90,000 <br />Total 90,000 90,000 <br />Funding Sources 2008 2009 2010 2011 2012 Total <br />Water Utility Fund 90,000 90,000 <br />Total 90,000 90,000 <br />