My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council - 02/12/2008
Ramsey
>
Public
>
Agendas
>
Council
>
2008
>
Agenda - Council - 02/12/2008
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/24/2025 3:02:01 PM
Creation date
2/11/2008 7:30:38 AM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council
Document Date
02/12/2008
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
361
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• <br />• <br />REVIEW OF 2008 CAPITAL IMPROVEMENT PROJECTS <br />By: Tim Himmer, Assistant City Engineer <br />Background: <br />CASE #,� <br />With the recent adoption of the 2008 - 2012 Capital Improvement Program (CIP), we would like to <br />provide a summary of the projects proposed for 2008. Although it is understood that specific <br />projects have not been approved, this provides Engineering and Public Works the opportunity to <br />outline the 2008 projects referenced in the CEP and develop a schedule for implementation. <br />STREET PROJECTS <br />1. Phase 1 of 167th Avenue extension (Nowthen Blvd. to Marble St.) <br />• Preliminary design <br />• Neighborhood meeting <br />• Undertake appraisals and necessary right-of-way acquisition <br />• Final design and specifications <br />• Construction <br />2. McKinley Street extension (Ramsey Blvd. to Sunfish Lake Blvd.) <br />• Preliminary design <br />• Undertake appraisals and necessary right-of-way acquisition <br />• Final design and specifications <br />• Construction <br />3. South Highway 10 Frontage Road (Riverdale Dr. & Rivlyn Ave.) <br />• Explore preliminary design options <br />• Investigate property acquisition needs <br />* Tliis item could be evaluated witli the proposed TH 10 interchange design discussions <br />UTILITY PROJECTS <br />1. RTC storm sewer outfall to the Mississippi River <br />• Easement acquisition from Anoka County <br />• Final design and specifications <br />• Submit permit applications to the various agencies (County, DNR, Army Corps) <br />• Construction <br />2. Water Treatment Plant <br />• Advance discussions on proposed site for river intake facility <br />• Undertake appraisals <br />• Begin acquisition for intake facility, treatment plant, and transmission line route <br />3. Water Tower #3 in Elmcrest Park <br />• Select consultant to aid in preliminary design <br />• Final design and specifications <br />• Construction <br />-199- <br />
The URL can be used to link to this page
Your browser does not support the video tag.