My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council - 03/11/2008
Ramsey
>
Public
>
Agendas
>
Council
>
2008
>
Agenda - Council - 03/11/2008
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/19/2025 9:14:13 AM
Creation date
3/7/2008 1:29:07 PM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council
Document Date
03/11/2008
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
257
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
-184- <br />'teeth <br />1 Continue storm water inspection system and prioritize corrections as necessary. <br />2 Continue street maintenance performance evaluation program for seal coating and overlay <br />projects utilizing the street rating program with Engineering and PW staff. <br />3. Final upgrades to Public Works metal building (floor drains). <br />4. Formalize policy for private streets /walk /trail clearing. <br />5. Prioritize /document walk and trail maintenance service including hydrant clearing. <br />6. Continue educating residents on plowing process and stakirig policy (On- going): <br />7. Continue OSHA /MNDOT training in equipmentoperatior 0 - going). <br />trail syst <br />Utilities <br />1. Continue efforts to assure accurate water billing.' <br />2. Create a zone map for exercising water ut lit. salves in preparation l the task <br />seasonally. <br />3. Communicate maintenance events to public in advance <br />4. License appropriate staff in operation of sanitary se e <br />5. Research increased security at wa a supply station <br />Parks <br />1. Develop public - tica on ark and <br />2. Complete Ma's Trail Plan`aer intra age <br />3. Implement 2008P`rks Capit mprovemer <br />4.,. Complete design and onstructto of new par, <br />5. Begin ro ss of plan <br />6. <br />7. ®.o ®►n planning fo a Parks inn "d liecreation Department. <br />8. i ue to identify opportunities to provide cost effective solutions to trail system and tree <br />transplantation with thy" e of o "-. ly acquired paver and tree spade (On- going). <br />9. Begin r sea thing fundin opportune i s for regional trail connections. <br />10. Complete ®e gn of Sunfis tike Park. <br />11. Create beautification plan f o re ntrances to city, parks, and trails, etc. <br />12. Continue collaboration wit, RAA and other amateur athletic organizations for athletic field and <br />facility needs. <br />Public Safety <br />Objective: Provide effective law enforcement services and fire <br />protection /suppression services for the Community. <br />Key: <br />New plans are indicated with italics text. <br />On going plans are indicated by normal text. <br />bsite, Cable TV, etc.) (On- going). <br />isposal systems (On oing). <br />flyer nd website. (On- going) <br />view (200 <br />an (annual revision). <br />uilding and playground at Elmcrest Park. <br />i park north of Trott Brook. <br />
The URL can be used to link to this page
Your browser does not support the video tag.