My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council - 03/11/2008
Ramsey
>
Public
>
Agendas
>
Council
>
2008
>
Agenda - Council - 03/11/2008
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/19/2025 9:14:13 AM
Creation date
3/7/2008 1:29:07 PM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council
Document Date
03/11/2008
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
257
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Councilmember Dehen asked if the City had ever considered having a City compost site He <br />stated that the County is almost all sand and this would give people the chance to compost their <br />organic material and get some soil that has been sitting to help enrich their lawns and gardens. <br />He asked whether organic content was most important or clay content for better water retention. <br />City Engineer Jankowski stated that both play a part and noted that there is a company in Elk <br />River that can prepare custom soils by including organic material for about $400 -$800 per lot in <br />a new subdivision. <br />Councilmember Dehen stated that he feels requiring 6 inches of topsoil is a lot and suggested <br />that if the City was trying to accomplish water retention that the thickness of the topsoil <br />requirement could be decreased if material such as clay could be incorporated into the soil. <br />Chairperson Elvig stated that he agrees that 6 inches is a lot of topsoil and would like to see a <br />cost breakdown of adding different materials such as compost or clay. He suggested that perhaps <br />requiring 4 inches of topsoil with a content of 20% organic material may be a wise idea. <br />City Engineer Jankowski stated that he will get this information for a future meeting. <br />Councilmember Dehen stated that he also wonders how this will be enforced and asked what <br />other cities were doing. <br />City Engineer Jankowski stated that this would be a similar requirement for subdivisions and the <br />City would get involved when developments are being mass graded. <br />Mayor Gamec stated that he thinks this is something that the Building Inspector can do on the <br />final inspection and just add something to the check list and do a few soil borings. <br />Councilmember Dehen reiterated that he would like to see the City take a look at a City compost <br />site. <br />Mayor Gamec stated that the City sold some individual compost bins a while back and that went <br />pretty well. He stated that the County has a compost site and it is a major production that takes a <br />lot of space and equipment. <br />City Administrator Ulrich suggested that the County be contacted to see what they would suggest <br />for the City: <br />Case #5 Review Capital Improvement Projects (CIP) <br />City Engineer Jankowski noted that he just wanted to highlight some of the projects have been <br />included in the CIP but reminded the Public Works Committee that none of them have been <br />officially authorized by the Council. He reviewed the three scheduled street projects: Phase 1 of <br />167t Avenue extension; McKinley Street extension (Ramsey Blvd. to Sunfish Lake Blvd.) and <br />South Highway 10 Frontage Road (Riverdale Dr. and Rivlyn Ave.). <br />Public Works Committee /January 15, 2008 <br />Page 10 of 13 <br />—93 <br />
The URL can be used to link to this page
Your browser does not support the video tag.