Laserfiche WebLink
<br />Urban Services <br /> <br />GOAL #1: A clean and protected water supply for drinking and recreation <br />for the current and future generations of Ramsey citizens and businesses* <br /> <br />STRATEGIES: <br /> <br />. Use best practices for managing stormwater on-site to reduce <br />infrastructure costs and protect local groundwater supplies* <br />. Explore ways to minimize ground water loss* <br />. Explore alternative sources for water supply* <br />. Coordinate with other agencies to monitor the quality and quantity of <br />groundwater aquifers* <br />. Complete the study of a new surface water supply/treatment plant on the <br />Mississippi River* <br />. Explore cosf-sharing and/or joint operation of utility systems with <br />adjoining jurisdictions to reduce cost 01" realize other efficiencies* <br />. Explore and encourage alternative stormwater management techniques <br />such as rain gardens and rain barrels, pervious pavement, gray water, <br />and native landscaping or other Best Management Practices (BMPs) to <br />supplement existing storm water management techniques* <br />. Explore long-term maintenance issues related to alternative stormwater <br />management techniques <br />. Ensure on-site septic systems are operating within State and local rules <br />and are adequately maintained <br />. Implement the surface water management plan <br />. Educate homeowners on Individual Sewage Treatment Systems (ISTS) in <br />the Ramsey Resident and other methods of communication <br /> <br />GOAL #2: Efficient and cost effective availability of sanitary sewer and <br />water to interested property owners <br /> <br />STRATEGIES: <br /> <br />. Establish a rational, logical staging plan for extension 'of MUSA consistent <br />with the Comprehensive Sewer Plan and tied to Comprehensive Plan <br />Amendment Policy <br />. Existing residents will not bear the costs of new infrastructure without <br />realizing a benefit that is equal to or greater that those costs* <br />. Explore cost-sharing and/or joint operation of utility systems with <br />adjoining jurisdictions to reduce cost or realize other efficiencies* <br />. Manage infiltration & inflow (I & I) into the sanitary sewer system^ <br />. Guide most new development to be connected to urban services without <br />adversely impacting existing neighborhoods <br />. Plan growth that is contiguous to existing development wherever possible <br />and that makes the most effident use of existing infrastructure <br />. When planning and building new infrastructure or replacing systems, use <br />the best technology available* <br /> <br />Comprehensive Plan Goals & Strategies Draft 2-2.8-08 <br /> <br />10 <br /> <br />'t, Information from a community planning session (05T) <br />^A goal or strategy from the existing Comprehensive Plan <br />110 symbol represents a proposed new goal or strategy . <br /> <br />~ Bonestroo <br /> <br />.. <br /> <br />-15- <br />