My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council - 04/08/2008
Ramsey
>
Public
>
Agendas
>
Council
>
2008
>
Agenda - Council - 04/08/2008
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/19/2025 9:17:12 AM
Creation date
4/4/2008 8:41:11 AM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council
Document Date
04/08/2008
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
231
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />parcel, which was apparently contemplated at the time ofthe original subdivision <br />approval. <br /> <br />By inc1udingthese additional elements with this project we can take advantage of economies of <br />scale and reduce restoration costs associated with installing the watermain alone, as the trail and <br />access road/parking facilities would be within the same alignment as the watermain. It would <br />also eliminate one very long cul-de-sac, and provide a roadway and trail connection for the <br />existing neighborhoods in the area. <br /> <br />Staff will be scheduling a neighborhood meeting soon to outline the project for the residents, and <br />gather information and discuss ideas/concerns that they may have related to the proj ect. . We will <br />come back before the Council at a later date for acceptance of plans and specifications, and to <br />request advertisement for bids. <br /> <br />Funding: <br /> <br />The watermaiil portion of this project is to be funded through the Water Utility Fund. The trail <br />construction, if approved, would be funded through the City Trail Fund. The access <br />road/parking facilities, if approved, would be funded through the Lawful Gambling Fund, <br />consistent with the approved CIP. Financing for the road connection between the existing <br />Gamet Street and 14Sth Lane cul-de-sacs, and associated land acquisition, have not been <br />determined at this time. A cost estimate and potential funding mechamsms will be available at <br />the meeting. Below is a summary ofthe financing for various elements of the proposed <br />improvements: <br /> <br /> Watermain Street Trail Total <br />Funding Source Looping Improvements Improvements Project <br />Water Utility Fund $195,000 $ $ $195,000 <br />City Trail Fund $ $ $90,000 $90,000 <br />Lawful Gambling Fund $ - $67,500 $ $67,500 <br />TOTAL $195,000 $67,500 $90,000 $352,500 <br />Recommendation: <br /> <br />City staff recommends that the Public Works Committee recommend to the City Council <br />authorization of Project #OS-XX, Alpine Park watermain looping; including the roadway and <br />trail connections, andparking facilities, and order the preparation of plans and specifications for <br />the improvements. <br /> <br />Reviewed by: <br />Public Works Director/Principal Engineer <br /> <br />PW: 03/18/08 <br /> <br />-79- <br />
The URL can be used to link to this page
Your browser does not support the video tag.