My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Public Works Committee - 04/15/2008
Ramsey
>
Public
>
Agendas
>
Public Works Committee
>
2000 - 2009
>
2008
>
Agenda - Public Works Committee - 04/15/2008
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/14/2025 8:25:52 AM
Creation date
4/11/2008 2:58:29 PM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Public Works Committee
Document Date
04/15/2008
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
39
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />CASE # / <br /> <br />. SUMMARY FOR 2007-2008 SNOW REMOVAL SEASON <br />By: Grant Riemer, Streets Supervisor <br /> <br />Background: <br /> <br />This case is meant to be a brief review ofthe 2007-2008 snow removal season. The snow <br />removal season consisted of 7 major plowing events with 4 of the events happening in <br />December and 16 minor events. Major events consist of calling in a full crew, plus part <br />time staff. Minor events normally consist of sanding intersections, plowing/sanding main <br />routes, drift control, etc.... Our first full scale plowing operation was on 12/2/07. <br /> <br />This season we started to incorporate pre-wetting to our snow and ice control program. <br />We use a liquid product called Caliber MI000. MI000 is a com based product combined <br />with a 30% Magnesium Chloride solution. The advantage is a lower operating <br />temperature compared to straight salt and also a reduction in "scatter and bounce." <br />Scatter-bounce is when dry salt comes off the spinner and hits the roadway. By pre- <br />wetting the salt at the spinner it has more of a tendency to stay where it is needed instead <br />of rolling off to the edge of the road or into the ditch. We had limited opportunity to use <br />the chemical this year, but it did seem to work as promised. By next season we will have <br />3 trucks equipped with pre-wetting equipment. The remaining trucks will be upgraded as <br />the budget allows. Conditions vary every winter, but we should be able to lower our <br />overall salt use in coming years. Our overall salt use was approximately 1200 ton this <br />season. <br /> <br />This year the APW A awarded the Shingle Creek Water Shed District with its Excellence <br />in Snow and Ice Control Award for implementing the same pre-wetting technology. <br />They are required to lower the overall chloride level in the watershed district by 71 %. <br /> <br />Complaints that we received phone calls on were similar in number to most years: <br />Mailbox damage-12 <br />Sod damage-25 <br />Misc.-71 <br /> <br />The miscellaneous category covers everything from snow at the end of my driveway to a <br />sidewalk that got missed or an icy intersection. <br /> <br />This year generated more calls for sidewalk and trail maintenance than normal. We had a <br />lot of drifting snow this winter which plugged our sidewalks and trails which required <br />going over them 2-3 times between snow falls. <br />Our equipment held up well with only routine maintenance required for the most part. <br /> <br />We did bend the blade on the sidewalk machine this spring, but that repair was made in <br />house. Overall it was a fairly normal season of snow removal. <br />
The URL can be used to link to this page
Your browser does not support the video tag.