<br /> Andrie Street Reconstruction <br /> Costs <br /> Item Qnty Unit Unit Cost Extension <br />1 B618 Cone. Concrete Curb & Gutter 20674 ft $ 10.00 $ 206,740.00 <br />2 Bit Ped Ramps 16 ea $ 300.00 $ 4,800.00 <br />3 Reclaim bit and class 5 35605 sq yd $ 0.80 $ 28,484.00 <br />4 Prepare road base 103.4 sta $ 150.00 $ 15,510.00 <br />5 Type MV3 Bituminous Wear & Nonwear Course 7236 tn $ 55.00 $ 397,980.00 <br />6 Bituminous Materials for Tack Coat 1723 gal $ 1.50 $ 2,584.50 <br />7 10ft Bit trail 10337 ft $ 17.00 $ 175,729.00 <br />8 Retaining wall 1400 sq ft $ 25.00 $ 35,000.00 <br />9 Centerline stripping - double yellow 10337 ft $ 0.90 $ 9,303.30 <br />10 Fogline Stripping - white 20674 ft $ 0.45 $ 9,303.30 <br />11 Repair driveways 65 ea $ 800.00 $ 52,000.00 <br />12 Topsoil 1787 cu yd $ 35.00 S 62,545.00 <br />13 Seed, fertilzer, and mulch 0.5 ac $ 1,350.00 $ 675.00 <br />14 Irrigation Repair 170 head $ 35.00 $ 5,950.00 <br />15 12 in RCP pipe 300 ft $ 17.00 $ 5,100.00 <br />16 15 in RCP pipe 850 ft $ 19.30 $ 16,405.00 <br />17 2X3 CB 24 ea $ 1,000.00 $ 24,000.00 <br />18 48 in Stm MH 2 ea $ 1,100.00 $ 2,200.00 <br /> Total Construction Cost $ 1,054,309.10 <br /> Total Project Cost w/25% OH $ 1,317,886.38 <br /> Financing <br /> Assessed Cost $ 123,044.00 <br /> MSA Cost $ 1,194,842.38 <br />