The total estimated cost of this alternative is $490,000 with an estimated construction cost of <br />$325,000. i,~he :major cost components would include grading, curb and gutter and pavement. <br />This alternative would have reduced drainage and wetland mitigation costs over Alternative 1, as <br />well as a reduced distance of roadway to be constructed. <br /> <br />Alternative~3: Maintain Status Quo. <br /> <br />An alternative with any construction project is of course, to do nothing or maintain the status quo. <br />The prime ~.ad, varltage of this alternative is that the initial cost is zero. However, the public will pay <br />the costs ati~ciitted with additional mileage travelled and additional travel time in perpetuity. <br />Future dev~lOpm~ ent may reduce the feasibility or increase the cost of providing this corridor at a <br />later date. ~ <br /> <br />Existing cross traffic between Armstrong Boulevard and Variolite Street will continue to increase <br />on residenti, al streets such as 156th and 157th Avenues. The rate of increase is highly dependent <br />upon devek~pm~nt. However, even a single successful commercial operation, such as the <br />soon-to-opg~ N0~Ythfork Golf Course, could significantly impact traffic levels on these streets. In <br />general, however, traffic levels might be expected to triple over the next twenty years. <br /> <br />Alternative 4: Improve 156th Avenue between Variolite Street and Armstrong <br /> Boulevard. <br /> <br />This alternative Would make use of the existing streets in the area and upgrade them to handle the <br />increased tmffic"volumes and truck loads. If 156th Avenue were improved to MSA standards, it <br />would still~re.qu4ffe traffic to expend additional travel distance and time involved. Similar to <br />Alternate 2~ it Would not only encourage, but it would actually place arterial volume traffic and <br />truck traffiO on ~;street platted and designed for residential use. Additional right-of-way would be <br />required arid the placement of the roadway would reduce setbacks for several homes to <br />approximately half of the recommended forty feet. <br /> <br />Traffic level:imPacts can be expected to be similar to those described for Alternate 3 with the <br />exception t~at the traffic increases anticipated on 157th Avenue would be directed to 156th Avenue. <br /> <br />Total projeCt~cos~t for this alternate would be $450,000 with $300,000 in construction costs. Major <br />constructiort Costs would include curb and gutter, pavement, drainage and restoration. <br /> <br />Alternative'5: Construct an Extension of County Road #116 from Ramsey <br /> Boulevard to Armstrong Boulevard. <br /> <br />This alternative was proposed by a resident at the December 10, 1991 meeting. The proposed <br />alignment is,illastrated on the attachment entitled Alternate 5. This alignment would extend <br />existing Cou$ty Road #116 from its existing terminus at Ramsey Boulevard westward for a length <br />of 1.2 miles terminating at the intersection with Armstrong Boulevard and the south line of Section <br />21. This wo~ld, effectively extend County Road #116 as a crosstown arterial from Armstrong <br />Boulevard ,eastward to the eastern City Limits. This alignment could not be considered a <br />crosstown ~_~eri~l further west than Armstrong Boulevard as traffic wishing to traverse the entire <br />length of tl~e.Ci~ would need to make two turns and travel a one-half mile distance north/south <br />along Arm~tiong Boulevard. There would be safety hazards similar to those identified in the <br />discussion 0f:Alfernative 2 with the speed differential caused by accelerating and decelerating over <br />a short distance. <br /> <br /> <br />