My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council Work Session - 04/22/2008
Ramsey
>
Public
>
Agendas
>
Council Work Session
>
2008
>
Agenda - Council Work Session - 04/22/2008
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/19/2025 9:18:41 AM
Creation date
4/18/2008 1:45:58 PM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council Work Session
Document Date
04/22/2008
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
25
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />Consider Converting Private Frontage Road <br />Behind Old Town Hall To A Public Roadway <br /> <br />Existing Conditions: This segment of private street extends a distance of 1200 feet from <br />142nd Avenue to CR 116. It is generally 24 to 25 feet wide and was constructed in sever~l <br />segments during the period of 1995 to 1997. The northerly 540 feet and the southerly 260 <br />feet have concrete curb and gutter. The middle 400 feet have bituminous berm curb. The <br />crOss sectional structure of the pavement is most likely 4 inches .of class 5 over 2 inches <br />of wear course bituminous. Two catch basins which are located^~djacent to the Super <br />America Station and behind the strip mall drain into the sedimentation pond behind the <br />strip mall. A curb cut behind the Bank drains into a sedimentation basin ahead of the <br />wetland. <br />This road is located bordered by a wetland and a tree line containing a number of <br />desirable mature trees on its western boundary. The eastern side of the road is adjacent to <br />commercial properties and a sedimentation pond. . <br /> <br />Proposed Modifications to Public Street Standards: Expanding th~ width of the <br />roadway is would be a requirement for its conversion to a public street. It is proposed that <br />the width be expanded to 28 feet. This additional width would be obtained by extending <br />the east curb line eastward on the northerly 540 feet and southerly 260 feet. The "middle <br />400 feet of the road could be widened in both sections. The road section would be <br />increased to 3.5 inches of bituminous. Drainage would be improved by adding cath" <br />basins to both sides of the roadway and creating a concrete pan section across the <br />roadway at the location of the existing curb cut. <br /> <br />$10,803 <br />3,660 <br />27,840 <br />2,725 <br />Total $ 45,028 <br />[n addition to the above construction cost an additional 25 % should be allowed for <br />design, staking, inspection, and project contingencies which would" bring the cost to <br />approximately $56,300. The above estimate assumes no costs for right of way. A <br />minimum of 50 feet would neeJ to be dedicated by the adjacent properties. <br /> <br />Cost Estimate: The construction costs associated with the above described modifications <br />are estimated as follows; <br />. Removals <br />. Storm sewer <br />. New pavement & Curb <br />. Restoration <br /> <br />-10- <br />
The URL can be used to link to this page
Your browser does not support the video tag.