My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council - 05/13/2008
Ramsey
>
Public
>
Agendas
>
Council
>
2008
>
Agenda - Council - 05/13/2008
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/19/2025 9:19:34 AM
Creation date
5/9/2008 2:15:40 PM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council
Document Date
05/13/2008
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
294
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
-1 0 4— <br />UPDATE ON IP 08 -06 ANDRIE STREET IMPROVEMENTS <br />IN NORTH FORK SUBDIVISION <br />By: Steven Jankowski, City Engineer <br />CASE # q <br />Background: <br />This case is being prepared subsequent to the approval of the Committee's recommendations <br />which were ratified by the City Council on April 8, 2008 relating to Improvement Project 08 -06. <br />This project originally proposed the standard bituminous overlay of Andrie Street and three cul <br />de sacs to the north on 164 Lane, but is now being considered to be expanded in scope. The <br />purpose of this case is to provide a project cost estimate and description for the expanded scope <br />of the work and also outline the next steps for public involvement. <br />The improvements associated with an expanded scope of the project for Andrie Street would <br />include the following: <br />• Reclamation of the existing bituminous and class 5 for reuse as a new base. <br />• Placement of 2" of bituminous base and 1 %" of bituminous wear course on the road. <br />• Installation of B style (high backed) concrete curb and gutter. <br />• The installation of a 10 foot bituminous trail along the east side of Andrie Street and the <br />north side of 164 Lane. <br />• Replacement of all the existing storm basins and the addition of approximately 1200 feet <br />of storm sewer to improve drainage: <br />• Restoration of driveways, irrigation systems, and lawns with seeding. <br />• Retaining wall is anticipated in selected areas. <br />It is proposed that the new roadway would be approximately the same width as the existing <br />street, 32 feet from flowline of curb to flowline of curb as compared to 31 feet on the existing <br />street. Two eleven foot drive lanes are proposed with an eight foot parking lane on the east and <br />north sides and a two foot curb reaction extension on the west and south sides. Parking would <br />also need to be restricted on this side of the street. The three cul de sacs, Halas, Fol titian, and <br />Driscoll Circles, would receive a 1 Y2" bituminous overlay of the existing pavement at the same <br />time as Andrie Street is reconstructed. <br />Attached is a preliminary cost estimate which projects the total project cost, including 25% for <br />overhead to be $1,317,886 with an MSA cost of $1,194,842 assuming the assessment to the <br />fronting property owners would be the equivalent of the one and one half inch bituminous <br />overlay proposed for the current IP 08 -06. A neighborhood meeting will be scheduled for <br />Wednesday April 23'' between 6:30 and 8:00 pm to present the project description outlined <br />above. <br />
The URL can be used to link to this page
Your browser does not support the video tag.