My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council - 05/13/2008
Ramsey
>
Public
>
Agendas
>
Council
>
2008
>
Agenda - Council - 05/13/2008
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/19/2025 9:19:34 AM
Creation date
5/9/2008 2:15:40 PM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council
Document Date
05/13/2008
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
294
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
A roll call vote was performed by the Recording Secretary. <br />Councilmember Dehen: aye <br />Councilmember Jeffrey: aye <br />Councilmember Strommen aye <br />Councilmember Look aye <br />Mayor Gamec aye <br />Councilmember Elvig absent <br />Councilmember Olson absent <br />Motion carried. <br />Case #5: Consider Awarding Bids for IP 08 -24 Sunwood Drive Streetscape <br />Improvements <br />Civil Engineer II Linton stated that the Ramsey Town Center project was originally designed to <br />be pedestrian friendly and also include things like benches, landscaping and irrigation. He <br />stated that there has been discussion about completing the streetscape improvements and after <br />the March 11, 2008 work session, the project was scaled back. He stated that staff is proposing <br />that the project be limited to the north side of Sunwood Drive from the Municipal Center to <br />Ramsey Boulevard and the south side of Sunwood Drive from the Municipal Center to Coborns. <br />He stated that it would involve installing sidewalks, planting beds, irrigation and coordination <br />with Connexus for the lighting. He stated that bids were opened on April 18, 2008, and the <br />apparent low bidder is Standard Sidewalk, Inc. He stated that there were 9 official bids and over <br />30 people picked up plans for this project. He stated that the second lowest bidder was Creative <br />Construction. He stated that staff has contacted references and found that Standard Sidewalk has <br />worked for both Minneapolis and St. Paul on their street replacement projects and comes highly <br />recommended. He stated that they have received a legal opinion that the City does not need to <br />go out to bid for the contract with Connexus. He stated that the funding source for this project <br />would be the RTC letter of credit and that staff recommends awarding the bid to Standard <br />Sidewalk, Inc. in the amount of $366,522.60 and also contract with Connexus for the installation <br />of the street lights. <br />Councilmember Jeffrey asked for a review of the RTC letter of credit funding. <br />City Attorney Goodrich stated that the City is authorized to make these types of improvements <br />and use the letter of credit funds. <br />Councilmember Look stated that there are already some sidewalks in place near Jim Deal's <br />building. <br />Civil Engineer II Linton stated that there are temporary sidewalks in place and the bid does <br />include tearing these out and completing them as part of the streetscape plans. <br />Councilmember Dehen asked why the sidewalk wasn't put in correctly the first time. <br />City Council / April 22, 2008 <br />Page 8 of 18 <br />
The URL can be used to link to this page
Your browser does not support the video tag.