Laserfiche WebLink
<br />c) Explore cost-sharing andforjoint operation of utility systems with <br />adjoining jurisdictions to reduce cost or realize other efficiencies* <br />d) Manage infiltration & inflow (1 & I) into the sanitary sewer system^ <br />e] Guidc mO:Jt ncw dC'Jclopmcnt to bc. connccted to urb~n 3crvicc3 without <br />~dvcr3cly imp~cting cxi::;ting ncighborhoods <br />f) Plan growth that is contiguous to existing development wherever possible <br />and that makes the most efficient use of existing infrastructure <br />g) Whenplanningand building new infrastructure or replacing systems, use <br />the best technology available* <br /> <br />Comprehensive Plan Goals & Strategies Draft 5-22-08 <br /> <br />14 <br /> <br />* From community planning session (OST) <br />^From existing Comprehensive Plan <br />~From EDA or Park Commission <br />no symbol represents a proposed new goal or strategy <br /> <br />. Bonestroo <br /> <br />.. <br /> <br />-129- <br />