<br />Jaspar & 152nd Ave Storm Sewer - Alternate A <br /> <br />Description Bid Onty Unit Unit Price Extension <br />Mobilization 1 Is $ 2,500.00 $ 2,500 <br />Traffic Control 1 Is $ 1,000.00 $ 1,000 <br />15 in HOPE pipe 350 ft $ 20.00 $ 7,000 <br />15 in FES 1 aa $ 750.00 $ 750 <br />72 in STMH 1 ea $ 3,000.00 $ 3,000 <br />Patch Street 1 Is $ 2,000.00 $ 2,000 <br />Yard restoration 1 Is $ 2.000.00 $ 2,000 <br />Construction cost total $ 18,250 <br />Project total $ 22,813 <br /> <br />52 <br />