Laserfiche WebLink
<br />163rd Ave & Llama Street Storm Sewer <br />Description Bid Qnty Unit Unit Price <br />Mobilization 1 Is $ 2,500.00 $ 2,500 <br />Traffic Control 1 Is $ 1,000.00 $ 1,000 <br />Remove Bit Pvmnt 670 sq yd $ 2.75 $ 1,843 <br />Sawcut Bit. 624 ft $ 2.50 $ 1,560 <br />Class 5 140 tn $ 16.00 $ 2,240 <br />Bit Base course 80 tn $ 70.00 $ 5,600 <br />Bit Wear course 60 tn $ 75.00 $ 4,500 <br />12 in RCP pipe 30 ft $ 18.00 $ 540 <br />21 in RCP pipe 600 ft $ 28.00 $ 16,800 <br />21 In RCP FES 1 ea $ 2,800.00 $ 2,800 <br />.2X3 CB 1 ea $ 1,300.00 $ 1,300 <br />72 in Stm MH 3 ea $ 3,700.00 $ 11,100 <br />Total Constr Cost $ 51,783 <br />Total Project cost $ 64,728 <br /> <br />54 <br />