My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council - 08/12/2008
Ramsey
>
Public
>
Agendas
>
Council
>
2008
>
Agenda - Council - 08/12/2008
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/19/2025 9:26:05 AM
Creation date
8/8/2008 2:11:33 PM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council
Document Date
08/12/2008
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
413
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CgSEu' J <br />CONSIDER AUTHORIZATION TO EXPAND A <br />MUNICIPAL CENTER CONFERENCE ROOM <br />By: Kurtis G. Ulrich, City Administrator <br />Background <br />The Ramsey Municipal Center was completed in late 2006 and has one large meeting <br />room and. six smaller conference rooms. The Alexander Ramsey Room seats 100 people <br />comfortably and the six smaller conference rooms seat 10-12 people each. Over the last <br />two years; both staff and community members have expressed the need for amid-sized <br />conference room in the Ramsey Municipal Center: <br />Staff has met with the City's original Construction Managers from 3D/I to discuss the <br />feasibility of expanding the Lake Itasca Conference Room (2nd floor, Administrative <br />Services). Based on those discussions, staff is proposing that the Itasca Room be <br />expanded from 23x16 to 23x27, which allows seating for 32-40 people, depending on the <br />layout of the room. <br />Staff has requested and received quotes from several of the original Municipal Center <br />contractors for demolition of an existing wall, building a riew wall, applying fabric/paint, <br />installation of HVAC, electrical, ceiling tile/ grid work and purchase and installation of <br />additional furniture. Quotes were requested from the original contractors because of the <br />relative size of this project and because of the need to preserve the quality and <br />consistency of work that we saw with the original construction of the conference room. <br />As a service to the City, the original Construction Managers from 3D/I have reviewed the <br />quotes from each of the contractors and have indicated that the quotes are competitive. <br />If this project is approved, the City will realize some cost savings by using surplus carpet <br />from the original project and by having the Building Division oversee the project rather <br />than having 3D/I serve as Construction Managers. <br />Based on the attached quotes for the demolition and construction of the conference room, <br />staff expects the cost of this expansion project to be approximately $23;000. Staff has <br />not yet received the quote for the new furniture; however, staff would like the City <br />Council to consider anot-to-exceed amount of $5,000 to purchase new furniture. Staff <br />will work with the City's original furniture supplier, Intereum, to provide furniture for the <br />expanded conference room. <br />Staff anticipates that, if approved by the City Council, the conference room expansion <br />would begin within 60 days of approval and would be complete in approximately 30 <br />days. <br />Staff Recommendation <br />Staff recommends that authorization be granted to expand the Lake Itasca Conference <br />Room at a cost not to exceed $28,000. <br />-124- <br />
The URL can be used to link to this page
Your browser does not support the video tag.