Laserfiche WebLink
& 152nd Ave Storm Sewer -Alternate A <br />Jaspar <br />Description Bid Qnty Unit Unit Price <br />00 <br />0 Exte <br />$ nsion <br />500 <br />2 <br /> 1 Is $ . <br />2,50 , <br />Mobilization <br />1 <br />Is <br />$ <br />1,000.00 <br />$ 1,000 <br />Traffic Control ft $ 20.00 $ 7,000 <br />15 in HDPE pipe 350 a $ 750.00 $ 750 <br />15 in FES 1 <br />1 e <br />ea <br />$ <br />3,000.00 <br />$ <br />3,000 <br />72 in STMH <br />1 <br />Is <br />$ <br />2,000.00 <br />$ 2,000 <br />Patch Street 1 Is $ 2,000.00 $ 2,000 <br />Yard restoration $ 18,250 <br />Construction cost total $ 22,813 <br /> Project total <br />-175- <br />