Laserfiche WebLink
<br />PARTIAL PAY ESTIMATE NO.1 <br /> <br />Date: July 30, 2008 <br />Project: 2008 Pavement Maintenance Program - Division A <br />Contractor: Allied Blacktop Inc. <br />Contract Amount: $419,367.05 <br />Award Date: June 10,2008 <br /> <br />The following work has been completed on the above referenced project: <br /> <br /> Qnty <br /> Item Bid O,nty Unit To Date Unit price Extcntion <br />1 Cracksealing Material 49,488 Ibs. 48066 $ 1.40 $ 67;292.40 <br />2 CRS-2 Bit mtl 43,219 gals 42640 $ 2.55 $ 108,732.00 <br />3 CRS-2 P Bit mtl 25,830 gals 24984 $ 3.20 $ 79,948.80 <br />4 FA 2 Granite Aggregate 274,715 sq yds 274715 $ 0.48 $ 131,863.20 <br />5 FA 2 Pea Gravel Aggregate 8,535 sq yds 8,535 $ 0.30 $ 2,560.50 <br />6 Obi yellow epoxy stripping 19,695 ft 0 $ 0.42 $ <br />7 White epxy stripping 39;389 ft 0 $ 0.20 $ <br />8 Thermoplastic zebra Xwalk 126 sq ft 0 $ 2:1..00 $ <br />9 Traffic Control 1 Is 0.5 $4,000.00 $ 2,000.00 <br />FC Repair Traffic Damage 1 Is 1 $1,500.00 $ 1,500.00 <br />Total Work Completed to Date: $ 393,896.90 <br />Less Previous Payments $ <br />Less Retainage @ 5% $ 19,694.85 <br />Total Due This Payment $ 374,202.06 <br /> <br />Contractor: I hereby certify that all items shown are correct for the work completed to <br />date: <br /> <br />~~~~ <br />. lliedElacktop Co. <br /> <br />~.. (,{ - og <br />Date <br /> <br />Engineer: ~ by .irtj,~~bove work is complete: <br />" 7;;////(/~. <br />',1 / /./ /1W-.. '. <br />- /.J' / <br />StevenJ Janko~skyPE <br /> <br />if <br /> <br /> <br />8/~ /()8 <br />Date <br /> <br />-93- <br />