Laserfiche WebLink
inspection during the warrantee period which MnDOT found ko be a strain on the available. <br />manpower. <br />R+~commendation; <br />$ased upon the experience of MnD4T .with their trial of extended warrantees, staff <br />recommends continuing the use of our existing General Conditions warrantee specification. <br />Consideration of an extended warrantee should be considered in instances where a specific <br />improvement which may be susceptible to early failure (i.e. landscaping improvements) <br />justifies the higher cost associated with the extended warrantee. <br />Action: <br />Motion to recommend to City Council to continue the use of oar existing General Conditions <br />twelve month warrantee specification. Consideration of an extended warrantee should be <br />considered in instances where a specific iznpzovernent may be highly susceptible to failure <br />justifies a higher cost associated with the extended. warrantee. <br />Reviewed By; <br />Director of Public Works/Principal City Engineer <br />Assistant City `Engineer <br />Public Worl~s Street Supervisor <br />City Attorney <br />PW; Q9/16/48 <br />122 <br />