Laserfiche WebLink
~~~YIwX~~~~Q ~~~~~ <br />"1"l~e esti.i~ated cast otthis praject including praject overhead is estimated to be ;~19"7,~9~ <br />Detailw at thy: praject eanstruction cost 4ire presented in ~~ppendi~t B. The praject <br />overhead, which adds an additional 3~ °~s, of tl~e construction cast include the following; <br />• Engineering design ~°/a <br />* 1'rajc;ct administration Sp/o <br />• Banding and legal ?n/o <br />• lnspectian and testing S% <br />• Contingencies. 1Q% <br />The abave praject casts da not include the cost of driveway paving: Because driveways <br />are- private property and not a portion of the public street each driveway .shall be <br />measured by area and material and will be billed individually to each property. 'The <br />estimated cast tar driveway paving is estimated to be $3.QQ per square foot. . <br />~'~N~I~+C~I~f~ <br />The fatal project costs consist otthe co~structican casts, property and cascrricxlt <br />accl~tisitian costs, and the overhead casts listed above. 'T liG project ccista have alsa been <br />divicl.ed between those casts assoc:iatc~l with the street ii~piovements and those related to <br />the improved starrra water system. ~~ll costs assaciatecl with the storm water <br />inapravernenks, including drainage atad utility easements shall be financed through the <br />City's Storm Water Utility;. Thy cosh associated with the street iix~provements shall be <br />financed one halt- (St)°i~) thoug:h special assessments to the ben~:fited properties adjacent <br />to the improved streets consistent: with Minnesota State Statutes 429 and City of Ramsey <br />Code C1lapter 4. The remaining SO% of the street improvements. will be :Financed with <br />Gity of Ramsey general funds revenues. <br />.Based upon the abave distribution the fatal project cast will be funded as (allows; <br />$49,723-:tram the City, gener~iTfund; X98,544 Pram the storm water utility; and $49,723 <br />troth assessments. The assessed portion otthe praject cast shall be assessed among the <br />benefited 11 properties listed in ~,ppendi:c C. The tlu~;e properties having double Frontage <br />with Waco Street whieh were assessed tar its irra.p.rov~;ment in 1993 shall. be one half of <br />tl~e a~x~ount assessed to each of the remaining benet'itted properties. Tl1e carver lots an <br />179t1~ bane would be charged a lull slaa;re cif the street irnprovenaertt casts. This would <br />result in an assessment of X5,234 per assessed share. <br />"Clue project will have a final tabul~ttian made on actual praject assts consistent ~vitl~ the <br />rrietlaodcalagy d~:saribed in this report. ~. public l~ear'ing will be held identifying the actual <br />casts to be recovered by special assessment. Property owner would have the option at <br />paying the :full cost oL~'tl~e assessment without interest at t17e canc;lusian of the praject or <br />could elect to have this assessment collected annually with their ta:~ payment over a ten <br />year period. Property owners electing to have the project cost specially assessed shall <br />44 _~.~ <br />