Laserfiche WebLink
significant concern that a sprinkler system will not be installed and that people could get trapped <br />in the building in the event of a fire, <br />Fire Chief Kapler. stated he has taken into account what types of materials will be located in the <br />building and determined that the level of combustibles will be minimal; in addition, given the <br />limited number of uses per week in the building, he felt it was an acceptable risk as long as it is <br />understood that the use will be temporary. <br />Commissioner Cleveland asked if fire extinguishers will <br />Fire Chief Kapler replied in the affirmative. <br />Commissioner Cleveland asked if the City has <br />and whether it has waived the requirement for a <br />Fire Chief Kapler stated he believed this is the first <br />Commissioner Van Scoy asked Fire Chief <br />.the applicant re-applied for this use at the e: <br />Fire Chief Kapler replied he would <br />Chairperson Nixt asked how staff <br />of combustibles stored on the pr <br />Fire Chief Kapler replied <br />inspections and added that <br />level of combustibles story <br />in the City <br />Interim Use Permit if <br />with respect to the level <br />Fat least annually to perform routine <br />applicant that there will be a minimum <br />any language that would give the City the <br />with the level of combustibles on site. <br />in the City is found to be operating in an unsafe manner, <br />Ch, . t stated that the unique nature of the applicant's proposed use, it appears <br />the Fire l : i ling to a use on a temporary basis due to their unique circumstances <br />with the ex - 11l have a lower level of potentially combustible materials stored <br />on site. He as should be added to the Interim Use Permit stating that the City has <br />determined that thy' -'': is use is compatible with this exception because the applicant will <br />not incur an unreasona amount of storage that could raise concerns with respect tore safety. <br />He added there is a, good faith expectation here regarding the applicant's storage of materials on <br />site. <br />Planning Commission/October 2, 2008 <br />Page 5 of 15 <br />—327— <br />