Laserfiche WebLink
Case # 7 <br /> <br />PUBLIC HEARING AND LEVY OF SPECIAL ASSESSMENTS FOR <br />IMPROVEMENT PROJECT #00-27 (B & B CARPET AND CITY WIDE <br />GARAGE DOOR COMPANY SEWER AND WATER EXTENSION) <br /> By: Steve Jankowski, City Engineer <br /> <br />Background: <br /> <br />This project extended sanitary sewer and water service to two properties along Trunk <br />Highway gl0 N.W., City Wide Garage Door Company and B & B Carpet building. The <br />project has been completed and the final costs have been tabulated. Assessable costs <br />have been divided into two categories, lateral costs and trunk costs. Lateral costs are <br />determined by the actual costs associated with constructing a lateral size sewer through <br />each of the benefited parcels. The trunk charge is determined based upon a standard area <br />charge based on the acreage of the land ser¥iced. <br /> <br />The final project costs have been tabulated and the assessments for each of the two <br />benefited parcels are as follows: <br /> <br />PiN OWNER Total Trunk Total <br /> Assessment Assessment Assessment <br />34-32-25-54-0001 CityWide Garage Door $39,203 $60,140 $99,343 <br />34-32-25-54-0004 B & B Carpeting $10,676 $10,878 $21..,.554 <br />34-32-25-54-0005 $10,676 $10,878 $21,554 <br />34-32-25-54-0006 $10,676 $10,878 $2t,554 <br /> Total $32,029 $32,635 $64,664 <br /> <br />Council Action: <br /> <br />Motion to adopt Resolution #00-09-XXX through #00-09-XXX adopting assessments for <br />Improvement Project #00-27. <br /> <br />Reviewed by: <br /> <br />City Administrator <br />Director of Public Works <br /> <br />CC: 09/26/00 <br /> <br />-113- <br /> <br /> <br />