Laserfiche WebLink
STATEMENT O F WORK C E RTI F I E <br /> <br /> STATE OF MIN~JESOTA DEPARTMENT OF TP~TSPO~TATION <br /> <br />MAIN BODY ITEMS (Group Level Detail) <br /> <br />D <br /> <br /> Voucher Ns. 4 Sheet No: !0 · <br /> Item Con~rac~ Unit Contract Contract To Data To Oa~e Grp Line <br /> <br /> 2504.602 HYDR~NT EACH ~,~ 447.51 8 . 00 11,580.08 8.00 11,580.08 007 0820 <br /> To,als for Proposal LAne Number 0820 8.00 $11,880.08 8.00 $11,580.08 <br /> <br /> 2504.602 ADJUST ~.VDRA~NT EACH 346.27 4.00 1,385.08 4.00 1,385.08 001 083~ <br /> 2~04.602 A~JUST ,~[YDRJ~NT EACH 346.27 1.00 346.27 1.00 346.27 003 0830 <br /> Totals for Proposal Line Number 0830 5.00 $1,731.35 8.00 $1,731.35 <br /> <br /> 2504.602 A~JTJST VAJ~VE BOX EACH 124.95 8.00 999.60 0.00 0.0O 001 0840 <br /> 2504.602 ADJUST VALVE 80X EACH i24.95 1.00 124.95 0.00 0.00 003 0840 <br /> Totals for Proposal Line Number 0840 9.00 $1,124.55 0.00 $0.00 <br /> <br /> 2504.802 300 MM BtTTTERFLY V~V~E EACH 790.07 4.00 3,160.28 5.00 3,950.35 007 085O <br /> Toaals for Proposal Line Number 0850 4.00 $3,160.28 5.00 $3,950.35 <br /> <br /> 2504.602 i50 MM GATE VALVE AiTD BOX EACH 430.13 8.00 3,441.04 8.00 3,441.04 007 0860 <br /> Totals for Proposal Line Nu~er 0860 8.00 $3,441.04 8.00 $3,441.04 <br /> <br /> 2504.602 200 MM GATE VALVE ~ BOX EACH 598.80 1.00 898.80 1.00 598.80 007 0870 <br /> Totals for Proposal Line Number 0870 1.00 $598.80 1.00 $598.80 <br /> <br /> 2504.603 150 MM WATERMAIN DUCTILE IRON CL 52 M 62.87 38.70 2,433.06 35.20 2,213.02 007 0880 <br /> · To,als for Proposal Line Number 0880 38.70 $1,433.06 35.20 $2,213.02 <br /> <br /> 2504.603 200 MM WATEr, IN DUCTILE IRON CL 52 M 56.92 466.60 28,558.87 532.30 30,298.51 007 0890 <br /> <br /> To~als for Proposal Line Number 0890 466.60 $26,558.87 532.30 $30,298.51 <br /> <br /> 2504.~03 250 ~4 WATERMAIN DUCTILE IRON CL 52 M 66.72 134.50 8,973.84 140.50 9,374.16 007 0900 <br /> <br /> To~als for Proposal Line Number 0900 " 134.50 $8,973.84 ~40.50 $9,374.16 <br /> <br />2504.603 300 MM WATER~N DUCTILE' IRON CL 52 M 72.38 1,010.00 73,103.80 702.40 50,839.7! 007 0910 <br /> <br /> To~als for Proposal LAne Number 0910 1,010.00 $73,103.80 702.40 $50,839.71 <br /> <br />2504.603 600 MM STEEL C~SING PIPE M 253.00 114.00 28,842.00 119.10 30,132.30 007 0920 <br /> Totals for Proposal Line Number 0920 114.00 $28,842.00 119.10 $30,132.30 ,/ <br /> <br />2504.604 50 ~ POLYS~f~ENE I~;SULATION M2 9.20 7.00 64.40 7.00 64.40 00? 0930 <br /> To,als for Proposal Line Number 0930 7.00 $64.40 7.00 <br /> <br />2504.608 WATERMAiN FITTINGS KG 5.70 1,935.00 11,029.50 0.00 0.00 007 0940 <br /> Totals for Proposal LAne Number 0940 1,935.00 $1!,029.50 0.00 $0.00 <br /> <br />LOW S.P. .%~3MBER 199-010-03 <br /> <br />FOR WORK COMPLETED AS OF 09/26/2000 <br /> <br />Contract Number: Z00516 <br /> <br />-80- <br /> <br /> <br />