Laserfiche WebLink
STATE OF MINNESOTA - DEPA_~TMENT OF TRANSPORTATION <br />S TAT E ME NT O F WORK C E RTI P I E <br /> <br />WORK O RDE R / M i NOR EXTRA WOR <br /> <br />D <br /> <br />K <br /> <br />I <br />I <br />I <br />I <br />I- <br />I <br />i <br />I <br /> I <br /> <br />Voucher No, 4 Sheet No: 21 <br /> <br /> Item Contract Unit Unit Mul~ To Date TO Date Grp Fed <br /> Number Item ~rice Factor Quantity Amount No. PAR/NON <br /> <br /> Wor~ order/Minor extra work 001 .................................................................................................... <br /> <br />T~E HOUSE REMOVALS DID NOT MENTION ANY FUEL TANKS. THE CONTRACTOR WILL <br /> <br /> TWO (2) FUEL TANK REMOVALS LS-$ 1.00 1.000000 2,970.00 2,970.00 001 <br /> <br /> Total for Work order/Minor extra work: 001 = $2,970.00 <br /> <br />Work order/Minor extra work 002 .................................................................................................... <br /> <br />THE ORIGIN~J~ PROVISIONS FOR THE FrELD OFFICE DID NOT INCLLrDE A FAX AND <br /> <br /> MITA Ai-1515F DIGITAL IMAGING SYSTEM LS-$ 1.00 1,000000 5,357.00 5,357.00 001 <br /> <br /> Total for Work order/Minor extra work~ 002 = $5,357.00 <br /> <br />Work order/Minor extra work 003 .................................................................................................... <br /> <br />THE HOUSE REMOVALS DID NOT INCLUDE REMOVAL <br /> <br /> ASBESTOS TEST & REMOVAL LS-$ 1.00 1.000000 10,692.00 10,692.00 <br /> Total for work order/Minor extra work: 003 = $10,692.00 <br /> <br />Work order/Minor extra work 005 <br /> <br />THE CONTRACTOR IS DIRECTED TO INSTALL A WORK ZONE SPEED LIMIT FOR THE <br /> <br /> ~ORK ZONE SPEED LIMIT L~NIT DAY L64.13 <br /> To~al for Work order/Minor extra work: 005 = $11,981.49 <br /> <br />Work order/Minor extra work 004 <br /> <br />THE TEMPORARY PAVEMENT HAS A LOW SPOT WITHOUT DRAINAGE. THE CONTRACTOR <br /> <br /> Force Account Grand Total -- W. 0.004 Lump Sum $ 1.00 1.000000 6,337.72 6,337.72 <br /> <br /> Total for Work order/Minor extra work: 004 = $6,337.72 <br /> <br />Grand total for Work order/Minor extra work = <br /> <br />$37,338.21 <br /> <br />S.P. NUMBER 199-010-03 <br /> <br />FOR WORK COMPLETED AS OF 09/26/2000 <br /> <br />Concracu Number:.--~%~16 <br /> <br /> <br />