My WebLink
|
Help
|
About
|
Sign Out
Home
2009 - 2013
Ramsey
>
Finance
>
Capital Improvement Program
>
2009 - 2013
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/10/2008 9:21:49 AM
Creation date
12/10/2008 9:21:37 AM
Metadata
Fields
Template:
Finance
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
367
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />Capital Improvement Program <br />City of Ramsey, Minnesota <br /> <br />2009 thru 2013 <br /> <br />Contact Unassigned <br />Department Stormwater Utility <br /> <br />Pr:oject # 04-STRM-005 <br />Project Name County Ditch #43 Cleaning <br /> <br />Type Improvement <br />Useful Life Unassigned <br />Category Storm Water Utility Improvem <br />Priority nla <br /> <br />Description I <br /> <br />County Ditch #43 drains an area of the City known as District Forty Three which extends north roughly to 153rd Ave and west to County Road <br />#57. It has been storm sewered through .the Flintwood Hills and River's Bend subdivisions and flows into the wetlands in River's Bend Park The <br />City will explore joint powers agreement with t~e WMO to determine ifWMO can maintain the County ditch system. This project will also <br />enhance the portions of Protected Wetland north of Sunwood Drive. It is an.ticipated that the project will take place concurrent with the <br />development of the vacant parcel located between Sunfish Lake Boulevard and County Ditch 43. <br /> <br />Justification <br /> <br />To.tal Project Cost $150,000 <br /> <br />The extreme northern portion of Ditch #43 has long been overgrown with vegetation and its pathway is barely distinguishable. The catch basin <br />outlets on 153rd Ave are frequently subm~rged and freeze closed in winter causing the street to flood and freeze. Re-ditching approximately 1600' <br />\~Iould serve to provide better drainage. This project will also fulfill a commitment made to the DNR during the construction of Sunwood Drive's <br />bride over Wetland 114 to im rove that wetland. . <br /> <br /> <br />Expenditures <br /> <br />Improvements Other than Build <br /> <br />Total <br /> <br />2009 <br /> <br />. 2010 <br /> <br />2011 <br />150,000 <br /> <br />150,000 <br /> <br />2012 <br /> <br />2013 <br /> <br />Total <br />150,000 <br /> <br />150,000 <br /> <br />Funding Sources 2009 <br />Storm Water Utility Fund <br /> <br />2010 <br /> <br />2011 <br />150,000 <br />150,000 <br /> <br />2012 <br /> <br />2013 <br /> <br />Total <br />150,000 <br /> <br />150,000 <br /> <br />Total <br /> <br />ReVis'?)OP'08 <br />
The URL can be used to link to this page
Your browser does not support the video tag.