|
<br /> City of Ramsey, Minnesota
<br />. Capital Improvement Program'
<br /> 2009 th.ru 2013
<br /> PROJECTS BY CATEGORY
<br />Category Project# . Priority 2009 2010 2011 2012 .2013 Total
<br />tWater Utility Improvement ,
<br />WM Looping: Alpine Dr. (CSAH 5 to Germimiurn St.) 04-WTR-OOl nla 10tl,00() 100,000
<br />WM Looping: Alpine Park to Regency Pond 04-WTR-002 nla 185,000 185,000
<br />Renovate Pump House 2 04-WTR-004 nla . 49,000 49,000
<br />Complete Pump House 3 04-WTR-005 o/a 50,000 . 60,000
<br />RTC Bunker Lake Blvd (Armstrong to Ramsey Blvd) 04-W,TR-009 n/a 225,000 225,000
<br />South Highway 10 Frontage Road 04-WTR-015 nla 90,000 . 90;000
<br />. Water Treatment Plant Construction 04-WTR-017 nla 1,000,000 8,700,000 8,700,000 18,400,000
<br />Watermain Looping: (Ramsey Blvd to Armstrong Blvd) 04-WTR-018 nla 226,100 226,100
<br />Elmcrest Park Water Tower 05-WTR-00l nla 5,100,000 ~, 1 00, 000
<br />1.5 MG Ground Storage Reservoir 05-WTR-004 nla 2,000,000 2,000,000
<br />Water Utility Security Improvements . 06-WTR-002 nla 21,000 21,000
<br />Well Rehabilitation 07-WTR-001 nla 20,000 22,000 24,000 26,000 28,000 120,000
<br />. River Pines Lift Station Water Connection 08-WTR-003 nla 20,000 20,000
<br />. Water Meter Replacement . 08-WT'R-004 nla 90,000 90,000 90,000 . 90,000 90,OQO 450,000
<br />Well House I Improvements 09-WTR-001 nla a,ooo 8,000
<br />SCADA System Upgrades 09-WTR-002 nla 10,000 10,000
<br />Irrigation at Water Tower #1 09-WTR-003 nla 12,000 12,000
<br />167th Ave Extension 09-WTR-004 rua 300,000 300,000
<br />Now & Then Estates Street Reconstruction 09-WTR-005 nla 120,000 120,000
<br />Water Utility Improvement Total 6,946,000 8,961,000 .11,039,000 116,000 434,100 27,496! 100
<br />GRAND TOTAL 6,946,000 8,961,000 11,039,000 116,000 434,100 27,496,1 DO
<br />
<br />.
<br />
<br />Revised 01/08
<br />
<br />287
<br />
|