Laserfiche WebLink
<br />.. ..,-_. ~.,. - - - >-. <br /> <br />Capital Improvement Program <br /> <br />City of Ramsey, Minnesota <br /> <br />2009 thru 2013 <br /> <br />Contact Unassigned <br />Department Water Utility <br /> <br />Project # 04-WTR-015 <br />Project Name South Highway 1.0 Frontage Road <br /> <br />_ T)'pe Improvement <br />Useful Life 50 Years <br /> <br />Category Water Utility Improvement <br />Priority n/a <br /> <br />I Description I ota rOJcct ost , <br />This project would consist of 1,000 lineal feet ofwaterrnain and boring Ul1det Highway 10, and a watermain loop provided for residents south of <br />Highway 10. <br />Total project costs includine: land, street, sewer, water and storm sewer = $790,000. - <br />Justification I <br />Water improvements thatwould be required to encourage optimal development and redevelopment within the area. Additionally, the residents east <br />of Tungsten (as well as the new development) would be on a dead end line. The looping of the watermain would benefit these individuals by <br />providing a more continuous flow of water and better fire protection. <br /> <br />T IP <br /> <br />C $90 000 <br /> <br />Expenditures 2009 <br />Building Cost/Construction <br /> <br />Total- <br /> <br />2010 <br /> <br />2011 <br /> <br />2012 <br /> <br />2013 <br />90,000 <br /> <br />90,000 <br /> <br />Total <br />90,000 <br /> <br />90,000 <br /> <br />Funding Sources <br />Water Utility Fund <br /> <br />2009 <br /> <br />2010 <br /> <br />2011 <br /> <br />2012 <br /> <br />2013 <br />90,000 <br />90,000 <br /> <br />Total <br />90,000 <br /> <br />90,000 <br /> <br />Total <br /> <br />298 <br />Revised 0//08 <br />