|
-160-
<br />PETITION FOR LOCAL STREET IMPROVEMENTS
<br />WITHIN THE CITY OF RAMSEY, MINNESOTA
<br />itamsey, Minnesota May i2, 2008
<br />To the City Council of Ramsey, Minnesota
<br />We the undersigned, owners representing not less than `fjf , percent (50 %) of the affected property parcels
<br />abutting on the real property proposed for assessment as part of the City of Ramsey Improvement Project 08-06, a
<br />bituminous overlay In the NorthFork subdivision within the City ofRamsey, Anoka County, hereby petition that
<br />the above improvement Project be modified as follows;
<br />• Andrie Street and l64" Lane would be reconstructed to the width of thirty two (32) feet, a nine (9) ton
<br />load limit and with concrete curb and gutter.
<br />• Andrie Street and l64 Lane would be striped for two driving lanes and one parking lane on one side. .
<br />Parking would be restricted on the other side.
<br />• Existing storm water catch basins would be replaced and the storm sewer would be extended to Andrie
<br />Street in several areas.
<br />• Do not install the City of Ramsey proposed five (5) foot concrete sidewalk on the East and North sides of
<br />Andrie Street and 164
<br />• The three cul de sacs, Hales, Portmann, and Driscoll Circles, would receive only a 1 i inch bituminous
<br />overlay of the existing pavement.
<br />We understand that the assessment for the above improvement will be equivalent to the assessment of the
<br />improvements associated with the bituminous overlay project currently anticipated in City of Ramsey CP 08 -06
<br />which states that properties abutting the above streets would be assessed one half of the cost of the bituminous
<br />overlay, We further understand that the above described modified project would not take place until 2009 at the
<br />earliest and the remaining costs of this project will be funded primarily through Municipal State Aid (MSA) funds
<br />since Andrie Street and 164 lane have been added to the City's MSA system,
<br />Examined, checked, and found to be in proper form and signed by the requ ired number of property owners of
<br />property affected by the making of the improvement petitioned for,
<br />(Seal) ,,•'�" °.---��" .
<br />Jo Ann (Jo) Thieling
<br />City Clerk '-
<br />Ramsey, MN .55303
<br />Signature of Property Owner
<br />Name (printed)
<br />Address (printed)
<br />1
<br />Pt ,Z.. °� a c,�_...
<br />/'7 cc' 0 4j_ 5.44
<br />. 1'? / �� d.! o
<br />2.
<br />'\\I
<br />\
<br />4 U,
<br />,)
<br />--�—
<br />o * l 4 �,i
<br />\\1;\
<br />1,5
<br />> ,
<br />PIr1,t� e 5+
<br />le . ,- 5-7 mik,1„1/IJAetIvt-iit.0„..
<br />tlilivoRiz,„ .7/ AI
<br />/ %i/,4/ 55340?
<br />..
<br />0
<br />1
<br />s o gC,7
<br />.6-‘..,s,
<br />RA-(44i-
<br />-160-
<br />PETITION FOR LOCAL STREET IMPROVEMENTS
<br />WITHIN THE CITY OF RAMSEY, MINNESOTA
<br />itamsey, Minnesota May i2, 2008
<br />To the City Council of Ramsey, Minnesota
<br />We the undersigned, owners representing not less than `fjf , percent (50 %) of the affected property parcels
<br />abutting on the real property proposed for assessment as part of the City of Ramsey Improvement Project 08-06, a
<br />bituminous overlay In the NorthFork subdivision within the City ofRamsey, Anoka County, hereby petition that
<br />the above improvement Project be modified as follows;
<br />• Andrie Street and l64" Lane would be reconstructed to the width of thirty two (32) feet, a nine (9) ton
<br />load limit and with concrete curb and gutter.
<br />• Andrie Street and l64 Lane would be striped for two driving lanes and one parking lane on one side. .
<br />Parking would be restricted on the other side.
<br />• Existing storm water catch basins would be replaced and the storm sewer would be extended to Andrie
<br />Street in several areas.
<br />• Do not install the City of Ramsey proposed five (5) foot concrete sidewalk on the East and North sides of
<br />Andrie Street and 164
<br />• The three cul de sacs, Hales, Portmann, and Driscoll Circles, would receive only a 1 i inch bituminous
<br />overlay of the existing pavement.
<br />We understand that the assessment for the above improvement will be equivalent to the assessment of the
<br />improvements associated with the bituminous overlay project currently anticipated in City of Ramsey CP 08 -06
<br />which states that properties abutting the above streets would be assessed one half of the cost of the bituminous
<br />overlay, We further understand that the above described modified project would not take place until 2009 at the
<br />earliest and the remaining costs of this project will be funded primarily through Municipal State Aid (MSA) funds
<br />since Andrie Street and 164 lane have been added to the City's MSA system,
<br />Examined, checked, and found to be in proper form and signed by the requ ired number of property owners of
<br />property affected by the making of the improvement petitioned for,
<br />(Seal) ,,•'�" °.---��" .
<br />Jo Ann (Jo) Thieling
<br />City Clerk '-
<br />Ramsey, MN .55303
<br />
|