My WebLink
|
Help
|
About
|
Sign Out
Home
Comp Plan Update 2005 Attempt
>
Comprehensive Plan
>
Comprehensive Plan (old)
>
2000-2009
>
2005
>
Comp Plan Update 2005 Attempt
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/14/2018 9:33:25 AM
Creation date
1/14/2009 9:38:22 AM
Metadata
Fields
Template:
Engineering
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
54
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br /> <br />Current Roadway System <br /> <br />Connectivity/Continuity Needs: <br />~ Ability to move people, goods, and services efficiently <br /> <br />~ Minimize distance traveled necessary to make trips <br /> <br />l:C Connectivity between places where trips originate and their <br />destinations <br /> <br />~ Improve continuity of east/west corridors <br /> <br />l:C Remove jogs in roads <br /> <br />[BIl :1~~~"IM~"""-= <br /> <br /> <br />Planned Roadway Improvements <br /> <br />Capacity Improvements: <br />l:C TH 10 - Convert to Freeway <br /> <br />~ Town Center Improvements <br />"CSAH 83/Armstrong Blvd <br />tt CR 116/lndustry Blvd <br />l:C CR 56/Ramsey Blvd <br /> <br />l:C CR 116 - Expand to 4-lanes <br />l:CTH 47 to CR 56 <br />l:C County CIP for 2009 <br /> <br />[Bit) il~~f:~ <br /> <br />7 <br />
The URL can be used to link to this page
Your browser does not support the video tag.