My WebLink
|
Help
|
About
|
Sign Out
Home
Contract (2)
>
Comprehensive Plan
>
Comprehensive Plan (old)
>
2000-2009
>
2001
>
Contract
>
Contract (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/15/2009 1:11:02 PM
Creation date
1/15/2009 1:08:58 PM
Metadata
Fields
Template:
Miscellaneous
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
11
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br /> <br />City of Ramsey <br /> <br />15153 NOWTHEN BOULEVARD NW., RAMSEY, MINNESOTA 55303 <br /> <br />PHONE (612) 427-1410 <br />FAX (612) 427-5543 <br />TDD (612) 427-8591 <br /> <br />July 15, 1997 <br /> <br />Mr. Fred Hoisington <br />HKgi <br />7300 Metro Boulevard, Suite 525 <br />Minneapolis, MN 55439 <br /> <br />Dear Mr. Hoisington: <br /> <br />Please find enclosed five (5) original contracts between your group and the City of Ramsey for <br />the 1998 Comprehensive Plan process. Please return three (3) back to our offices with <br />signatures. As mentioned to you on July 14, the Council added the Decision Resources survey <br />back into the basic scope of services. As also mentioned, we are requesting a specific timeline at <br />the earliest possible time in order to facilitate a newsletter mailing which will occur at the end of <br />this month. While Council will ultimately grant approval or revision of the timeline, the earlier <br />steps can begin at this time. I should also note that we are currently under a development <br />moratorium. There has been some discussion about the length of that moratorium and its <br />relationship to the Comprehensive Plan timeline. Hence, I believe there will be some desire to <br />expedite at least some ofthe facets ofthe product to the extent possible. <br /> <br />The staff people who will be assigned various segments of this project are as follows: <br /> <br />Sylvia Frolik, Zoning Administrator - Project Leader <br />Steve Jankowski, City Engineer <br />Dave Chmielewski, Landscape Architect <br />Kirk Skoog, Community Development Assistant <br />Linda Waite-Smith, Administrative Services Manager <br /> <br />Should you have any questions regarding the above or the contract scope, please do not hesitate <br />to contact me. Your primary contact beyond that point will be Sylvia. <br /> <br />SinCWM <br /> <br />~ R. Schroeder <br /> <br />RRS/jmk <br />Enclosures <br /> <br />c: Mayor and Council <br />Staff <br />
The URL can be used to link to this page
Your browser does not support the video tag.