My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council - 01/27/2009
Ramsey
>
Public
>
Agendas
>
Council
>
2009
>
Agenda - Council - 01/27/2009
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/18/2025 3:48:06 PM
Creation date
1/22/2009 11:54:29 AM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council
Document Date
01/27/2009
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
219
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PROJECT: Ermine Boulevard Culvert Replacement <br />BMI PROJECT NO.: R13.39195 <br />OWNER: City of Ramsey <br />CONTRACTOR: Dryden Excavating <br />DATE: January 6, 2009 <br />DESCRIPTION: <br />CHANGE ORDER NO. 1 <br />WHEREAS: The Original Contract provides for the construction of a 14' x 6' box culvert under Ermine <br />Boulevard, and <br />WHEREAS: Due to the timing of the project it has been determined that the proposed temporary bypass <br />pipe needs to be increased from 12" to 24" to accept the existing flows in Trott Brook, and <br />WHEREAS: It has been determined that unsuitable foundation soils exist below the proposed culvert, and <br />WHEREAS: It has been determined that the unsuitable foundation soils need to be excavated and <br />disposed of off site, and <br />WHEREAS: It has been determined that the site needs to be dewatered to allow for the excavation of the <br />unsuitable soils, and <br />WHEREAS: Clean granular borrow will be needed to replace the unsuitable soil below the water table. <br />NOW THEREFORE, BE IT MUTUALLY AGREED THAT: <br />The Contractor shall provide a 24" temporary bypass pipe. In addition, the Contractor shall dewater the <br />site, excavate unsuitable foundation soils, dispose of the soil off site, and backfill below the water table <br />with clean granular borrow as directed by the Engineer. Measurement and Payment shall be as shown <br />on the attached Estimate of Cost. <br />APPROVED: <br />`- . <br />CITY ENGINEER f J a�--� 1 Project Manager 1/6/09. <br />Title Date <br />CONTRACTOR: <br />Title Date <br />OWNER: <br />Title Date <br />
The URL can be used to link to this page
Your browser does not support the video tag.