My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council - 01/27/2009
Ramsey
>
Public
>
Agendas
>
Council
>
2009
>
Agenda - Council - 01/27/2009
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/18/2025 3:48:06 PM
Creation date
1/22/2009 11:54:29 AM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council
Document Date
01/27/2009
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
219
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
4 <br />After receiving appropriate documentation to show that the project has been completed, FEMA will <br />initiate a revision to the FIRM, FBFM, and FIS report. Because the BFEs would change as a result of the <br />project, a 90 -day appeal period would be initiated, during which community officials and interested <br />persons may appeal the revised BFEs based on scientific or technical data. <br />The basis of this CLOMR is, in whole or in part, a culvert project. NFIP regulations, as cited in <br />Paragraph 60.3(b)(7), require that communities assure that the flood - carrying capacity within the altered <br />or relocated portion of any watercourse is maintained. This provision is incorporated into your <br />community's existing floodplain management regulations. Consequently, the ultimate responsibility for <br />maintenance of the culvert rests with your community. <br />This CLOMR is based on minimum floodplain management criteria established under the NFIP. Your <br />community is responsible for approving all floodplain development and for ensuring all necessary permits <br />required by Federal or State law have been received. State, county, and community officials, based on <br />knowledge of local conditions and in the interest of safety, may set higher standards for construction in <br />the SFHA. If the State, county, or community has adopted more restrictive or comprehensive floodplain <br />management criteria, these criteria take precedence over the minimum NFIP criteria. <br />If you have any questions regarding floodplain management regulations for your community or the NFIP <br />in general, please contact the Consultation Coordination Officer (CCO) for your community. Information <br />on the CCO for your community may be obtained by calling the Director, Mitigation Division of FEMA <br />in Chicago, Illinois, at (312) 408 -5529. If you have any questions regarding this CLOMR, please call our <br />Map Assistance Center, toll free, at 1- 877 -FEMA MAP (1- 877 - 336 - 2627). <br />Sincerely, <br />O <br />Enclosures <br />Max H. Yuan, P.E., Program Specialist <br />Engineering Management Branch <br />Mitigation Directorate <br />cc: Mr. Stephen Jankowski <br />City Engineer <br />City of Ramsey <br />Ms. Suzanne Jiwani, P.E. <br />Department of Natural Resources <br />State of Minnesota <br />Mr. Duane Hansel, P.E. <br />Bolton & Menk, Inc. <br />For: William R. Blanton Jr., CFM, Chief <br />Engineering Management Branch <br />Mitigation Directorate <br />
The URL can be used to link to this page
Your browser does not support the video tag.