My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Parks and Recreation Commission - 02/12/2009
Ramsey
>
Public
>
Agendas
>
Parks and Recreation Commission
>
2009
>
Agenda - Parks and Recreation Commission - 02/12/2009
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/25/2025 1:30:34 PM
Creation date
2/10/2009 11:47:10 AM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Parks and Recreation Commission
Document Date
02/12/2009
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
19
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />CASE # 2 <br /> <br />MISSISSIPPI RIVER ACCESS TRAIL UPDATE <br />By: Leonard Linton, Civil Engineer II <br /> <br />Background: <br /> <br />This case provides an update on the trail associated with the County Pond Storm Sewer Outlet <br />(aka Ramsey Town Center Storm Sewer Outlet). The Ramsey Town Center project required a <br />storm sewer outfall to the Mississippi River. The plan included a trail for public access and <br />maintenance purposes. The Developer did not install the pipe before they ceased construction on <br />the Ramsey Town Center Project. The City decided to move forward in 2008 with preparing <br />plans and specifications for installation of the pipe and path. The trail design included use of <br />boulder retaining walls for seating and slope stability. The slopes will also be stabilized with <br />shrubs and trees. The project was awarded in December 2008 and the contractor has started <br />installing the pipe. The slope restoration and trail paving will be completed in the spring of 2009 <br />after the frost is out of the ground. The trail will extend fi'om the Mississippi river to the <br />Highway 10 right-of-way. <br /> <br />Plans for the trail and slope stabilization are included in the packet. <br /> <br />Funding Source: <br /> <br />The funding for this project is from the Stormwater Utility Fund. <br /> <br />Commission Action: <br /> <br />No Action required. <br /> <br />Reviewed by: <br />Director of Public Works/Principal City Engineer <br /> <br />P&R: 2/12/09 <br /> <br />3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.